FlexSym
©
OLT-mini Installation and Turnup Guide
Page 17 of 35
Powering up the OLT-mini
Once the power and fiber routing is completed, apply power to the OLT. The OLT-mini
will begin displaying LED indications to provide information on the health of the unit.
The device is labeled to indicate the position of each link and its associated LEDs.