
LE910Cx HW User Guide
1VV0301298 Rev. 33
Page 43 of 128
2021-06-29
Not Subject to NDA
A flow chart showing the AT commands managing procedure is displayed below:
Figure 7: AT commands managing procedure
In this case, the module will start power on sequence immediately
after VBATT supply is applied
Note:
Active low signals are labeled with a name that ends with "#" or with
“_N”
Note:
To avoid a back-powering effect, it is recommended to prevent any
HIGH logic level signal from being applied to the module’s digital pins when
it is powered OFF or during an ON/OFF transition.
Note:
Waiting time for the AT commands answer can vary between
different LE910Cx variants, between 2-6 sec.