12
S-PLAN WIRING LAYOUT
AND SYSTEMS SCHEMATIC
E N L
FUSED SWITCH
230V/50 hz
WIRING CENTRE
L
N
E
4
5
6
7
8
9
10
2 CHANNEL
TIME CONTROL
L
N
E
HEAT
WATER
NOTE
1-10
ARE LINKED
PUMP
9
N
E
E
N
9
9
2
3
1
S/LIVE
N
E
PERM LIVE
IF REQUIRED
BOILER
HIGH
LIMIT
DUAL
CYLINDER
STAT
STORE
6
8
4
5
ROOM
STAT
CYLINDER
VALVE
8
2
10
9
GRY
B
N
GRY
B
2
10
5
9
N
HEATING
VALVE
THE BOX NUMBERS INDICATE
THE POSITION ON WIRE CENTRE
COLOUR CODES
BROWN =
BR
ORANGE =
ORG
GREY
=
GRY
BLUE
=
N (NEUT)
EARTHS ARE NOT DRAWN
INSTALL AS NECESSARY
NOTE
THE CONTROLS PROVIDED MUST BE USED
ONE IMMERSION HEATER REQUIRES A 16 AMP SUPPLY.
TWO IMMERSION HEATERS REQUIRE A 32 AMP SUPPLY.
FAILURE TO INSTALL WILL INVALIDATE GUARANTEE
DRAWING SHOWS
“S” PLAN SYSTEM WITH DANFOSS CONTROLS
BR
BR
ORG
ORG
NEW TORNADO/TEMPEST 25336 19/4/05 12:25 PM Page 9