Telesis TEBL3 Installation Instruction Download Page 1

 

INSTALLATION INSTRUCTION 

 

SELF-DIAGNOSTICS/SELF-TESTING OPTION 

  

  

1. When AC power is supplied to fixture, the unit will automatically initiate a self-test and self-diagnostic 

 

test as follows:

 

(1)

 

Verifies battery disconnection, charger board failure, lamps failure and transformer failure at every 5 seconds. 

(2) 3 minute self-testing every month. 

(3) 90 minutes self-testing on the 12th month of the year after installation. 

 

 

2. Dual color LED lamp indicator shows the following status: 

 (1) Green color: ON/ Ready

 

                  Blinking:   Testing 

(2) Red color (Service Alert) 

(3) Service Alert LED Code (Red color LED lamp indicator) 

One blink ON/pause    (4 seconds)

Battery is not connected 

Two blinks ON/pause   (4 seconds)

Battery is shorted or battery voltage drops below acceptable level

Three blinks ON/pause

 

 (4 seconds)

Charger board circuit fault 

Four blinks ON/pause

  

 (4 seconds)

Power converter fault

Five blinks ON/pause   (4 seconds)

Emergency lamp fault 

Six blinks ON/pause    (4 seconds)

Remote head's emergency lamp fault (if installed) 

 

CAUTION: 

After solving the fault of emergency equipment, pl

e

ase press test button for 2 seconds without releasing to reset.

LED indicator will show green. 

 

3. For manual test, press test button as follows: 

Press test button once     (within 2 seconds) 

30 seconds test 

Press test button twice     (within 2 seconds) 

3 minutes test 

Press test button 3 times

 

 

  (within 2 seconds) 

30 minutes test 

Press test button 4 times   (wit hin 2 seconds) 

90 minutes test 

    

 

4. Remote Capacity for Self-Test Option (when applicable)

:

 

In order to connect remote lamp heads with self-diagnostics/self-testing option, please refer to the instruction on the next page. 

 

  

 

 

 

SAVE THESE INSTRUCTIONS

Page 1 of 2

Reviews: