![Telesis TEBL3 Installation Instruction Download Page 1](http://html1.mh-extra.com/html/telesis/tebl3/tebl3_installation-instruction_1082169001.webp)
INSTALLATION INSTRUCTION
SELF-DIAGNOSTICS/SELF-TESTING OPTION
1. When AC power is supplied to fixture, the unit will automatically initiate a self-test and self-diagnostic
test as follows:
(1)
Verifies battery disconnection, charger board failure, lamps failure and transformer failure at every 5 seconds.
(2) 3 minute self-testing every month.
(3) 90 minutes self-testing on the 12th month of the year after installation.
2. Dual color LED lamp indicator shows the following status:
(1) Green color: ON/ Ready
Blinking: Testing
(2) Red color (Service Alert)
(3) Service Alert LED Code (Red color LED lamp indicator)
One blink ON/pause (4 seconds)
Battery is not connected
Two blinks ON/pause (4 seconds)
Battery is shorted or battery voltage drops below acceptable level
Three blinks ON/pause
(4 seconds)
Charger board circuit fault
Four blinks ON/pause
(4 seconds)
Power converter fault
Five blinks ON/pause (4 seconds)
Emergency lamp fault
Six blinks ON/pause (4 seconds)
Remote head's emergency lamp fault (if installed)
CAUTION:
After solving the fault of emergency equipment, pl
e
ase press test button for 2 seconds without releasing to reset.
LED indicator will show green.
3. For manual test, press test button as follows:
Press test button once (within 2 seconds)
30 seconds test
Press test button twice (within 2 seconds)
3 minutes test
Press test button 3 times
(within 2 seconds)
30 minutes test
Press test button 4 times (wit hin 2 seconds)
90 minutes test
4. Remote Capacity for Self-Test Option (when applicable)
:
In order to connect remote lamp heads with self-diagnostics/self-testing option, please refer to the instruction on the next page.
SAVE THESE INSTRUCTIONS
Page 1 of 2