
Instrument Maintenance
Teledyne ML - T101 Operation Manual
208
Figure 8-3. H2S - SO2 Converter Assembly
•
Wrap the band heater around the new replacement cartridge and tighten
the screws using a high-temperature anti-seize agent such as copper
paste. Make sure to use proper alignment of the heater with respect to
the converter tubes.
•
Replace the converter assembly, route the cables through the holes in
the housing and reconnect them properly. Reconnect the grounding
clamp around the heater leads for safe operation.
•
Re-attach the tube fittings to the converter and replace the insulation
and cover.
•
Replace the instrument cover and power up the analyzer.
Summary of Contents for T101
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...ii This page intentionally left blank ...
Page 10: ...vi This page intentionally left blank ...
Page 12: ...viii This page intentionally left blank ...
Page 22: ...TABLE OF CONTENTS Teledyne ML T101 Operation Manual xviii This page intentionally left blank ...
Page 166: ...Remote Operation Teledyne ML T101 Operation Manual 162 This page intentionally left blank ...
Page 248: ......
Page 336: ...This page intentionally left blank B 4 07266B DCN6485 ...
Page 339: ...APPENDIX D Wire List and Electronic Schematics D 1 07266B DCN6485 ...
Page 340: ...This page intentionally left blank 07266B DCN6485 D 2 ...
Page 345: ...D 7 07266B DCN6485 ...