
Teledyne ML – T101 Operation Manual
Calibration Procedures
181
The following example sets Sequence2 to carry out a zero-span calibration every other
day starting at 01:00 on September 4, 2002, lasting 15 minutes. This sequence will start
0.5 hours later each day.
Table 6-4. Example Auto-Cal Sequence
MODE AND
ATTRIBUTE
VALUE
COMMENT
SEQUENCE
2
Define Sequence #2
MODE
ZERO-SPAN
Select Zero and Span Mode
TIMER ENABLE
ON
Enable the timer
STARTING DATE
Sept. 4, 2002 Start after Sept 4, 2002
STARTING TIME
01:00
First Span starts at 01:00
DELTA DAYS
2
Do Sequence #2 every other day
DELTA TIME
00:30
Do Sequence #2 0.5 h later each day
DURATION
15.0
Operate Span valve for 15 min
CALIBRATE
ON
The instrument will re-set the slope and offset values for the H
2
S
channel at the end of the AutoCal sequence
Summary of Contents for T101
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...ii This page intentionally left blank ...
Page 10: ...vi This page intentionally left blank ...
Page 12: ...viii This page intentionally left blank ...
Page 22: ...TABLE OF CONTENTS Teledyne ML T101 Operation Manual xviii This page intentionally left blank ...
Page 166: ...Remote Operation Teledyne ML T101 Operation Manual 162 This page intentionally left blank ...
Page 248: ......
Page 336: ...This page intentionally left blank B 4 07266B DCN6485 ...
Page 339: ...APPENDIX D Wire List and Electronic Schematics D 1 07266B DCN6485 ...
Page 340: ...This page intentionally left blank 07266B DCN6485 D 2 ...
Page 345: ...D 7 07266B DCN6485 ...