
Calibration Procedures
Teledyne ML – T101 Operation Manual
170
6.4.
MANUAL CALIBRATION WITH ZERO/SPAN VALVES
Zero and Span calibrations using the Zero/Span Valve option are similar to that described
in Section 6.2 except that:
Zero air and span gas is supplied to the analyzer through the zero gas and span gas inlets
rather than through the sample inlet.
The zero and cal operations are initiated directly and independently with dedicated
buttons (
CALZ
&
CALS
)
STEP ONE
: As shown below connect the sources of zero air and span gas to the
respective ports on the rear panel (Figure 3-2).
External Zero
Air Scrubber
Filter
MODEL 701
Zero Air
Generator
Source of
SAMPLE Gas
VENT if input is pressurized
MODEL T700
Gas Dilution Calibrator
Chassis
Sample
Zero Air
Exhaust
Span
Calibrated
H
2
S gas
(At high
concentration)
Figure 6-2. Setup for Manual Calibration with Z/S Valve Option Installed
Summary of Contents for T101
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...ii This page intentionally left blank ...
Page 10: ...vi This page intentionally left blank ...
Page 12: ...viii This page intentionally left blank ...
Page 22: ...TABLE OF CONTENTS Teledyne ML T101 Operation Manual xviii This page intentionally left blank ...
Page 166: ...Remote Operation Teledyne ML T101 Operation Manual 162 This page intentionally left blank ...
Page 248: ......
Page 336: ...This page intentionally left blank B 4 07266B DCN6485 ...
Page 339: ...APPENDIX D Wire List and Electronic Schematics D 1 07266B DCN6485 ...
Page 340: ...This page intentionally left blank 07266B DCN6485 D 2 ...
Page 345: ...D 7 07266B DCN6485 ...