background image

SofTA 300S ELSD
Quick Start Guide

Overview

This quick start guide will take you through the steps 

to successfully set up and use your SofTA 300S ELSD. 
Please see the SofTA 300S ELSD User Manual for more 
information regarding this product.

Connections

Exhaust: The ELSD exhaust is a ½” O.D. stainless 
steel tube. Use the supplied exhaust adaptor and 
additional tubing to connect to a fume hood dur-
ing operation. 

Communication: An output jack can be found on 
the back of the ELSD for connection to a chart 
recorder, computing integrator, or computer-
ized data system. The maximum signal output is 
1 V.

Gas Connections: Connect a supply of clean, dry, 
inert gas regulated to 65 psi to the 

GAS

 

INLET

 port 

on the back of the unit. The internal gas regula-
tor maintains the gas pressure at the factory set 
value displayed on the front panel.

Power Connection: The ELSD operates at either 
120 V or

 

240 V, 50/60 Hz. 

Fluid Connections: Connect the outlet from your 
HPLC injector to the inlet line on the front of the 
unit. The length and volume between the injec-
tor outlet and the detector inlet should be kept 
as short as possible to avoid unnecessary band 
broadening. 

Thermo-Split Drain: Place the ¼” stainless steel 
drain adapter, provided in the accessory kit, on 
the drain port located on the front of the instru-
ment.   Direct the outlet of the tube to a collec-
tion vessel below the drain. Place the open end 
of the flexible ¼” elastometric tubing in a suit-
able waste container, and trim the length as nec-
essary. Watch the liquid level in the container 
during operation and empty it when it is full 
(especially when running the spray chamber at 
sub-ambient temperature). 

Location

All components of the system should be placed on a 

sturdy table or bench in a room with a room tempera-
ture of 20 ± 5 °C. The detector is designed to fit 
alongside an HPLC system. The detector must be placed 
with at least 4” of clearance on the right and back of the 
detector to allow for proper air flow through the 
detector. Access to the back of the unit is required to 
make the appropriate connections and provide for safe 
removal of the power cord.

Operation

Instrument Controls

The ELSD is controlled via six touch-sensitive keys 

on the front panel labeled PWR (power), A/Z (A/Z), ESC 
(escape), 

▲ 

(up), 

▼ 

(down) and ENT (enter) found 

behind the front panel. The touch-sensitive keys are 
activated by lightly placing a finger over the light repre-
senting the key. An audible beep is heard when the key 
is activated. Touching the 

 or 

 keys will circulate the 

parameters section to review operation conditions. If 
there is a * at the upper right corner, touching ESC key 
will bring up a screen to explain what’s wrong. 

Menu

Touching the ENT key will bring up the M

ENU

 screen. 

SC = Spray Chamber (setpoint: 10 °C to 60 °C; readout 
range: -10.0 °C to 120.0 °C)
DT = Drift Tube (setpoint: 22°C to 120°C; readout 
range: -10.0 °C to 120.0 °C)
OC = Optical Cell (setpoint: 22 °C to 70 °C; readout 
range: -10.0 °C to 120.0 °C)
RST= Reset baseline to about 20 mV.
BLN = Baseline reading (5000.000 – 0.000 mV)
GAS = Gas (0.0 to 130.0 psi)
FLT or BFT = Baseline Filter (OFF, weight 1

 

to 10)

FS = Full Scale (1 V or 10 mV)
GAIN = Gain (Normal or Low)
CAL = Calibration (50% to 200%)

Start-up

1. Make all connections (gas, liquid, power, com-

munications, exhaust, and drain) as described 
above. Do not turn on the gas supply yet.

2. Press the M

ENU

 | Power key to begin self-diag-

nostic tests. When the tests are complete, press-
ing the M

ENU

 | Power key again will exit standby 

mode.

3. Confirm that the correct conditions are set by 

touching the 

 or 

 keys to cycle through the 

parameters.   If not

touch the M

ENU

 | Power key 

to display the M

ENU

 screen. Touch the 

 or 

 

keys to select set points. Touch M

ENU

 | Power 

key to accept the changes. The A

UTOZERO

 key 

functions as an escape key, and abandons any 
changes made.

4. Start your HPLC pump to deliver 1 mL/min 

mobile phase to the detector. When you see liq-
uid coming out of the drain port, the internal “p” 
trap is filled with the mobile phase. (This may 

Instruction Sheet 8-243109

May 2016

Reviews: