
4250 Flow Meter
Section 4 Options and Accessories
4-10
Figure 4-3 Removing the lower shield
3. In the lower right hand corner of the power supply PCB,
disconnect the red wire’s spade connector from J3 and con-
nect it to J1.
Figure 4-4 Type ‘E’ modification
4. Replace the metal shield and carefully reattach the front
panel to the flow meter case.
Disconnect from J3.
Connect to J1.
Summary of Contents for 4250
Page 2: ......
Page 4: ......
Page 12: ...4250 Flow Meter Table of Contents x ...
Page 28: ...4250 Flow Meter Section 1 Introduction 1 16 ...
Page 90: ...4250 Flow Meter Section 2 Programming 2 62 ...
Page 140: ...4250 Flow Meter Section 4 Options and Accessories 4 30 ...
Page 160: ...4250 Flow Meter Appendix A Replacement Parts and Accessories A 2 ...
Page 161: ...4250 Flow Meter Appendix A Replacement Parts and Accessories A 3 ...
Page 166: ...4250 Flow Meter Appendix A Replacement Parts and Accessories A 8 ...
Page 184: ...4250 Flow Meter Appendix C General Safety Procedures C 10 ...
Page 191: ...4250 Flow Meter Appendix D Material Safety Data Sheets D 7 ...
Page 192: ...4250 Flow Meter Appendix D Material Safety Data Sheets D 8 ...
Page 196: ......
Page 198: ......
Page 200: ......
Page 202: ...Warranty ...
Page 204: ......