Energy 2510 D
Rev. 004
16
GB
functionality of panel is necessary to completely
re-initialize (contact the Service).
7.3.2 Automatic Version (optional)
If you wish the start-up batteries to be recharged
automatically in the
En 2510D
generating sets, it
is possible to install the
ASP
(optional) automatic
control panel (fig. 25) instead of the manual
control panel.
The elements making it up are:
1 ON/OFF switch for the start-up and switch-off
function
2 Display
3 High temperature indicator
4 Minimum oil level indicator
5 Start-up failed indicator
6 Generator running indicator (flashing)
7 Maintenance request indicator
8 Fuel reserve indicator
9 Hour or voltmetric changeover switch button
10 Reset
11 Battery charged indicator
12 Automatic function indicator
13 AUTO/MAN switch for the automatic or
manual function
7.4 MANUAL operation
See section 7.1
7.4.1 AUTOMATIC operation
Turn the AUTO/MAN switch (fig. 25 ref. 13) to the
AUTO position and set the start-up switch (fig. 25
ref. 1) to ON position.
The automatic function indicator (fig. 25 ref. 12)
will light up.
When the voltage at the ends of the 12V DC
terminals of the generating set is lower than 11.5
Volts, the generating set will begin the start-up
procedure (similar to that of the manual
operation).
During the operation in automatic mode, the
display
(fig. 25 rif. 2) will show the total running
hours of the generating set. Press the hour or
voltmetric changeover switch button
(fig. 25 ref.
9) to display the voltage at the end of the 12V DC
terminals, i.e. at the ends of the battery.
When the battery is charged, and anyway after at
least 15 minutes’ running, the battery charged
hours indicator (fig. 25 ref. 11) will light up and
the electronic control panel will turn off the
generating set.
To select automatic or
manual mode is necessary to position the
AUTO / MAN switch before turning on the
panel with the ON / OFF switch.
Remember that the time which is taken by the
generating set in automatic mode to recharge the
battery may vary according to the battery status,
the amount of connected batteries and the ambi-
ent temperature.
Generally, the lower the temperature the less the
time required to charge the battery.
Applying any load higher
than the energy just then available in the
battery will prevent the generating set from
turning on due to insufficient voltage.
Summary of Contents for Telair ENERGY 2510D
Page 23: ...Rev 004 Energy 2510 D GB 23 12 ENERGY 2510 D WIRING DIAGRAM...
Page 24: ...Energy 2510 D Rev 004 24 GB 13 ENERGY 2510 D LIST OF SPARE PARTS...
Page 25: ...Rev 004 Energy 2510 D GB 25...
Page 26: ...Energy 2510 D Rev 004 26 GB...
Page 27: ...Rev 004 Energy 2510 D GB 27...
Page 28: ...Energy 2510 D Rev 004 28 GB...
Page 42: ...Energy 2510 D Rev 004 42 GB...
Page 43: ...Rev 004 Energy 2510 D GB 43...
Page 44: ......