![Teldat MTC+ Installation Manual Download Page 13](http://html1.mh-extra.com/html/teldat/mtc/mtc_installation-manual_1079561013.webp)
Chapter 4 Power-Switch Command
This command is found in the router monitoring menu (enter P 3 to access it).
Once there, access the POWER-SWITCH monitoring menu by running feature power-switch .
The available commands are displayed by entering “ ?”.
POWER-?
delete
Deletes a registered MTC+
list
Shows all connected devices
off
Cut off the power supply
on
Supply power
reset
Equivalent to an OFF command which after
10 seconds is followed by an ON
scan
Checks that all the MTC+ registered are
still connected
status
Display the status (ON/OFF)
temperature
Get current temperature of chip surface
version
Display the code version
voltage
Get internal current voltage
exit
To select the MTC+ you want to send the command to, enter the command followed by a space and then the ID of
the MTC+. If you want to send said command to all of them, enter all.
These commands will only take effect if executed through Telnet.
Teldat S.A.
4 Power-Switch Command
MTC+
9