![Teladoc Health MA-20068 Quick Start Manual Download Page 17](http://html1.mh-extra.com/html/teladoc-health/ma-20068/ma-20068_quick-start-manual_1079295017.webp)
Schedule a Test Session
NOTES
:
l
These steps must be completed prior to granting connectivity between the
Provider Access Software and the Teladoc Health TV for clinical use.
l
It may take up to a day to receive a response for the request for test.
l
Before scheduling the test session, make sure all areas where the Teladoc
Health TV is are to be used are available at the time of the test.
1.
for Performance Verification of the
Teladoc Health TV installation.
2.
You will receive an email from Teladoc Health Technical Service to complete
setup and to schedule a test session within one business day.
Powering Off the Teladoc Health TV
There is no need to power OFF the Teladoc Health TV if simply turning off the display.
17
Teladoc Health TV Quick Start Guide