Performance veri
fi
cation
Procedures
The following procedure checks that the Option BG outputs are operating
correctly. Be sure you have performed the performance veri
fi
cation preparation
before proceeding. (See page 19,
Trilevel sync outputs test
Perform the following procedure to verify the blanking level and sync amplitude
of trilevel sync signals. The following equipment is required for the test:
Oscilloscope
75
Ω
BNC cable
75
Ω
feed-through terminator
1.
Use the 75
Ω
BNC cable and the 75
Ω
feed-through terminator to connect
the
BLACK 4
connector on the SPG8000 to the oscilloscope CH1 input as
shown in the following
fi
gure.
Figure 17: Setup for tri-level sync and black (PAL) output tests
2.
Load the factory default preset. (See page 20,
3.
Select the
1080 59.94i
HD sync signal for BLACK 4 output on the SPG8000
as follows:
a.
Press the
BLACK
button until you see
BLACK 4 : FORMAT
.
b.
Press the left (
◄
) or right (
►
) arrow button to select
1080 59.94i
, and
then press
ENTER
.
c.
Repeat this step for the
BLACK 5
output.
SPG8000 Speci
fi
cations and Performance Veri
fi
cation
67