Section 7: TSP command reference
Models 707B and 708B Switching Matrix Reference Manual
7-18
707B-901-01 Rev. B / January 2015
channel.connectrule
This attribute controls the connection rule for closing and opening channels in the instrument.
Type
TSP-Link accessible
Affected by
Where saved
Default value
Attribute (RW)
Yes
Instrument reset
Recall setup
Create configuration script
Save setup
channel.BREAK_BEFORE_MAKE
Usage
rule
= channel.connectrule
channel.connectrule =
rule
rule
•
channel.BREAK_BEFORE_MAKE
or
1
: Break-before-make (BBM)
connections for relays in the instrument
•
channel.MAKE_BEFORE_BREAK
or
2
: Make-before-break (MBB)
connections for relays in the instrument
•
channel.OFF
or
0
: Does not guarantee a connection rule. The instrument
closes relays as efficiently as possible to improve speed performance without
applying a rule
Details
The connection rule describes the order in which switch channels are opened and closed when using
channel.exclusiveclose()
,
channel.exclusiveslotclose()
, and scanning commands
like
scan.execute()
and
scan.background()
. These commands may both open and close
switch channels in a single command. The connection rule dictates the algorithm used by the
instrument to order the opening and closing of switches.
The connection rule affects the operating time of these commands. These commands do not allow
the instrument to continue execution until the settle time of the relays has expired.
When the connection rule is set to
channel.BREAK_BEFORE_MAKE
, the instrument ensures that all
switch channels open before any switch channels close. When switch channels are both opened and
closed, this command executes not less than the addition of both the open and close settle times of
the indicated switch channels.
When the connection rule is set to
channel.MAKE_BEFORE_BREAK
, the instrument ensures that all
switch channels close before any switch channels open. This behavior should be applied with caution
because it will connect two test devices together for the duration of the switch close settle time. When
switch channels are both opened and closed, the command executes not less than the addition of
both the open and close settle times of the indicated switch channels.
With no connection rule (set to
channel.OFF
), the instrument attempts to simultaneously open and
close switch channels in order to minimize the command execution time. This results in faster
performance at the expense of guaranteed switch position. During the operation, multiple switch
channels may simultaneously be in the close position. Make sure your device under test can
withstand this possible condition. When switch channels are both opened and closed, the command
executes not less than the greater of either the open or close settle times of the indicated switch
channels.
You cannot guarantee the sequence of open and closure operations when the channel connect rule
set to OFF. It is highly recommended that you implement cold switching when the channel connect
rule is set to OFF.