Installation
6.
Push
OK Compensate Signal Paths
from
the resulting side-bezel menu.
OK Com-
pensate
Signal
Paths
The calibration will take approximately
10 minutes to complete.
7.
After calibration, verify that the status indicator
on the lower-bezel menu displays
Pass
.
Utility Page
Calibration
Signal Path
Pass
Factory
Pass
If it does not, then recalibrate the instrument
or have the instrument serviced by quali
fi
ed
service personnel.
G
8.
Service personnel use the factory calibration
functions to calibrate the internal voltage
references of the oscilloscope using external
sources. Refer to your Tektronix
fi
eld of
fi
ce
or representative for assistance with factory
calibration.
NOTE.
Signal Path Compensation does not include calibration to the probe tip. (See page 22, Compensating a Passive Voltage
Probe.)
Tektronix 4000 Series Oscilloscopes User Manual
33
Summary of Contents for 4000 Series
Page 4: ......
Page 18: ...Preface xiv Tektronix 4000 Series Oscilloscopes User Manual ...
Page 53: ...Installation 2 Power off your oscilloscope Tektronix 4000 Series Oscilloscopes User Manual 35 ...
Page 68: ...Installation 50 Tektronix 4000 Series Oscilloscopes User Manual ...
Page 312: ...Application Examples 294 Tektronix 4000 Series Oscilloscopes User Manual ...