background image

TYPE 321 OSCILLOSCOPE

F A C T O R Y

 

C A L I B R A T I O N  

P R O C E D U R E

Quick check for long ends,  unsoldered joints,  wire dress,  etc.  Preset all pots 

and trimmers  to mid-range.  Check front panel controls  for position and operation.

1. 

CHECK POWER SUPPLY RESISTANCES TO GROUND

Primary of Power Transformer --  Infinite

10 Volts.  Regulated to Converter --  Infinite

The  following readings  taken with Com.  Lead of Ohmmeter on ground:

+45

200 

Q

+45 Dec.

600

 

Q

+10

80

 Q

+6.3

Q

+6.3 Dec.

Q

-10

1000 

Q

-10 Dec.

1400 Q

-45

4000 Q

-7 2 0

5 Meg Q

*NOTE:  These readings will vary depending on range used.  Use lowest

possible  range.

1A. 

CHECK RESISTANCE ACROSS BATTERY TERMINALS

With common lead of  ohmmeter  on Neg.  terminal read 300 Q,  reverse leads 
and read infinite.  Power switch off.

2. 

CHECK VOLTAGES  AND REGULATION

Adjust 10 Volts regulated ,  (Check D.C.  regulation.) 105-125.  Measure
voltages from converter.

TYPICAL MEASUREMENTS

+45

45.5

Ripple

 

5 mv

+45 Dec.

47

2

 mv

+10

9.5

3

 mv

+6.3

6.3

150

 mv

+6.3 Dec.

6.3

100

 mv

-1 0

- 1 0

3

 mv

-10 Dec.

-1 1

2

 mv

-45

-44

5

 mv

-7 2 0

-7 2 0

750 mv

January i

960

321-1

Summary of Contents for 321 Series

Page 1: ... 45 200 Q 45 Dec 600 Q 10 80 Q 6 3 8 Q 6 3 Dec 8 Q 10 1000 Q 10 Dec 1400 Q 45 4000 Q 720 5 Meg Q NOTE These readings will vary depending on range used Use lowest possible range 1A CHECK RESISTANCE ACROSS BATTERY TERMINALS With common lead of ohmmeter on Neg terminal read 300 Q reverse leads and read infinite Power switch off 2 CHECK VOLTAGES AND REGULATION Adjust 10 Volts regulated Check D C regul...

Page 2: ... Apply 03 V to the vertical INPUT jack on the 321 from the calibrator in the test scope Set the VOLTS DIV switch to 1 Set the VERT GAIN ADJ for 5 major divisions of signal display Switch from AC to DC There should be no change in gain Check the VARIABLE sensitivity control for sufficient range 10 CHECK VERTICAL AMPLIFIER BALANCE With the VERTICAL POSITION control centered the trace should be withi...

Page 3: ...ntil the sweep triggers Further CW rotation will cause the sweep to free run The STABILITY control should be positioned approximately mid way between the point at which the sweep triggers and the point at which it free runs 17 CHECK VERTICAL FREQUENCY RESPONSE With the VOLTS DIV switch on the 01 position feed enough 50 KC signal from the 190 into the vertical INPUT to obtain 4 major divisions of d...

Page 4: ...ll VARIABLE TIME DIV control to give 5X MAG Adjust the MAG GAIN control R348 to give 2 markers per major division Check sweep timing in all ranges 2 26 SET 5 iiSEC DIV TIMING Apply 1 psec markers to the vertical INPUT Set the TIME DIV switch to 5 pSEC Adjust C160L for 1 marker per 2 major divisions 27 SET SLOW SWEEP ADJ Using 1 sec markers from the 180 switch the TIME DIV to the 5 SEC position Adj...

Page 5: ... of the 117Q 10W resistor on the left side of the scope viewed from the front With the switch in the DRY CELLS position the reading will be 0 volts Switch to the 2 5AH position and the meter should read 37 40V Switch to the 4 3AH position and the meter should read 34 36V Now switch the scope ON and the meter should read 14 16V in the 4 3AH posi tion 16 18V in the 2 5AH position and 0 V in the DRY ...