Teknion Interpret Installation Manuals Download Page 1

Section:
Description:

Page No: 

Date: 

Rev. No:  8

Feb 2017

1 of 17

INT_002a

interpret 

Double- Sided Beginning Frame (WWSDB),

 Power Cut-Out Worksurface (WWWRP)

Part and Product Identification

AA 

- Angled Leg

         Assembly
         (N02-3687) x1

For Customer Support please contact

     [email protected]

AA

AE2
AF

Power Cut Out
Worksurface

(WWWRP) x as

per order

Angled Leg 78" Frame Assembly shown

Power Access
Doors

(WWEDR)

For installation see
Electrics section,
IG# INT_404

AG

AE1

NOTE: Quantities of Front

Standoff (AG), Spacer (AN)
and Hardware (AI), (AL) &
(AM) change with the length
of the Frame.

OR

AB 

- Straight Leg

         Assembly
        (N02-3686) x1

AC 

- Mid Gable

         Assembly
         (N02-2053) x1

AD1 

-Transverse

          Beam Assembly
          (N02-3688) x3

AD2 

-5/16-18x2.5

         Socket Head
         Cap Screw
        (E01-0756) x24

AD3 

-5/16-18 Hex

          Nut 1/2 A/F
          .265 Th.
          (E01-0755) x24

AE1 

- Central Rail Cap

          (A23-4058) x1

AE2 

- Central Rail

           Assembly
          (A21-0888) x1

AG 

- Front Standoff

          (B02-0658)
          48"-72" x2
          78"-96" x4

AF 

- Central Rail Cap

          Assembly
          (N02-2149) x1

AH 

- Cantilever Brkt

(A16-4882\12)

x2

AI 

-  #10x0.875" LG

         Quad, Pan Wash.
         (E07-0077)
          48"-72" x4
          78"-96" x8

AJ 

-   1/4-20x3-1/2 Fl

          Mach. Quadrex
          (E01-0771) x4

AK1 

- Worksurface

          Spacer Block
          (A25-0547) x4

AK2 

- 5/16-18x3.75

          Hex Cap Screw
          (E01-0799) x10

 AK3 

- 5/16-18 Hex

          Nut1/2 A/F.265
          (E01-0755) x10

Pre assembled

X02-0116 x1

Leveler Cover is
located inside Leg,
assembled and

secured in place

with tape.

N02-2090 x1

 AM 

- 5/16-18 Hex Nut, 1/2

A/F.265 (E01-0755)

78"-96" x4

 AL 

- 5/16-18 x 2 1/2 LG,

Hex, Zinc (E01-1136)

78"-96" x4

 AN 

- Spacer Bracket

(A25-0548) 78"-96" x4

AC

AD1

AK1

AH

AN

Summary of Contents for Interpret

Page 1: ...x1 AD1 Transverse Beam Assembly N02 3688 x3 AD2 5 16 18x2 5 Socket Head Cap Screw E01 0756 x24 AD3 5 16 18 Hex Nut 1 2 A F 265 Th E01 0755 x24 AE1 Central Rail Cap A23 4058 x1 AE2 Central Rail Assembly A21 0888 x1 AG Front Standoff B02 0658 48 72 x2 78 96 x4 AF Central Rail Cap Assembly N02 2149 x1 AH Cantilever Brkt A16 4882 12 x2 AI 10x0 875 LG Quad Pan Wash E07 0077 48 72 x4 78 96 x8 AJ 1 4 20x...

Page 2: ...BE Cantilever Brkt A16 4882 12 x2 BF 10x0 875 LG Quad Pan Wash E07 0077 48 72 x4 78 96 x8 BG 1 4 20x3 1 2 Fl Mach Quadrex E01 0771 x4 BH1 Worksurface Spacer Block A25 0547 x4 BH2 5 16 18x3 75 Hex Cap Screw E01 0799 x10 BH3 5 16 18 Hex Nut1 2 A F 265 E01 0755 x10 BA Mid Gable Assembly N02 2053 x1 BB1 Transverse Beam Assembly N02 3688 x3 BB2 5 16 18x2 5 Socket Head Cap Screw E01 0756 x24 BB3 5 16 18...

Page 3: ...C2 5 16 18x2 5 Socket Head Cap Screw E01 0756 x24 CC3 5 16 18 Hex Nut 1 2 A F 265 Th E01 0755 x24 CD1 Central Rail Cap A23 4058 x1 CD2 Central Rail Assembly A21 0888 x1 CF Front Standoff B02 0658 48 72 x2 78 96 x4 CE Central Rail Cap Assembly N02 2149 x1 CG Cantilever Brkt A16 4882 12 x2 CH 10x0 875 LG Quad Pan Wash E07 0077 48 72 x4 78 96 x8 CI 1 4 20x3 1 2 Fl Mach Quadrex E01 0771 x4 CJ1 Worksur...

Page 4: ... Gable Connection Side View AD3 AD2 STEP 1 Remove mounting Screws and Nuts from the Clamps save them for future installation Identify End and Middle Gable connections End Gable Position You can t see through the Clamp Transverse Beam is touching the End Gable Mid Gable Position See through Clamp you can see the Bolt Transverse Beam is installed one set of holes over interpret ...

Page 5: ...e CONNECT MIDDLE BEAM AND GABLES Feb 2017 5 of 17 INT_002a interpret AC Position End Gables with holes facing inward AD1 End Gable Connection Mid Gable connection C L C L AA STEP 2 Attach middle Transverse Beam to End and Mid Gables ...

Page 6: ...n Beam to Gables using Socket Cap Screws and Nuts removed in step 1 Level and square the whole assembly Tighten Screws and Nuts NOTE Do not over tighten STEP 4 Angle remaining Transverse Beam assemblies and engage them into Gables AD1 AD1 End Gable Connection Mid Gable Connection AD3 AD2 Underside View interpret ...

Page 7: ...STEP 5 Fasten together using Socket Cap Screw and Nuts Level and square the whole assembly NOTE Do not over tighten BB1 AD2 AD3 BB3 BB2 STEP 6 Remove mounting Screws and Nuts as shown and save for future step Indicate End and Middle Gable connections End Gable Connection Mid Gable Connection interpret ...

Page 8: ...NT_002a 8 of 17 Feb 2017 STEP 7 Remove Clamp Brackets from where End Gable Connection was indicated and relocate them one hole over in direction indicated above to create Mid Connection BB2 BB3 End Gable Connection detail Mid Gable Connection detail interpret ...

Page 9: ...NT_002a 9 of 17 Feb 2017 STEP 9 Attach assembled Frame to the Beginning Frame Fasten with Screws and Nuts saved in previous step STEP 8 Install Mid Gable End Cap making sure they swing sideways Fasten Beams to the Mid Gable M id Gable Connections BB2 BB3 Begining Frame BA BB2 BB3 interpret ...

Page 10: ...T_002a 10 of 17 Feb 2017 STEP 10 Remove Screws and Nuts from Clamp Brackets as shown and save for future installation Determine connection types on each end Mid Gable Connection End Gable Connection End Gable Connection Mid Gable Connection CC3 CC2 CC2 CC3 interpret ...

Page 11: ...17 Feb 2017 End Gable Connection STEP 12 Attach Finish Frame to Beginning and Middle Frames assembly STEP 11 Attach Beams to End Gable using side of the Beam with End Gable connection Fasten with Screws and Nuts saved from previous step DO NOT TIGHTEN Middle Frame CC2 CC3 CC2 CC3 Mid Gable Connection CA1 interpret ...

Page 12: ...P 14 Lock each leveler and remove tape so Leveler Cover can slide down If specified please continue with Returns Refer to IG 003a 004a STEP 13 Level and square whole assembly Use string to align holes C L C L C L C L Equal Equal Lock Levelers Remove tape so Leveler Cover can slide down interpret ...

Page 13: ...n Page No Date INSTALL SPACER BRACKETS Feb 2017 13 of 17 INT_002a product line STEP 15 Attach Spacer Brackets to End and Mid Gables BI AL AN AM BK CK CM BJ CL NOTE This step is only applicable to Frames 78 wide and above ...

Page 14: ... to Installation Guides INT_401a 402 403a 406a to 404 STEP 16 Place Cantilevers on the top of Traverse Beams For widths less than or equal to 72 the inner face of the Cantilever should be placed approximately 13 from the inner face of the Frame The Cantilevers must be spaced 32 apart for widths greater than or equal to 78 Install electrics as specified AG AK1 BH1 CG CJ1 CF interpret ...

Page 15: ...lts into channels located underside of Rails Install End Caps on 2 Beginning and End Central Rails Secure in place turning End Caps Set Screws AE2 CD2 End Cap End Cap STEP 18 Raise each Central Rail assembly over Frames Slide Screws inside the rail to line them up with the holes in Cantilevers Clamps and Spacer Blocks Drop Central Rails on the top of Frames NOTE Start from the Middle one for easie...

Page 16: ...able Connection Pilot hole to be used in Middle Gable Connection UNDERSIDE VIEW Worksurfaces shown installed on WWSDB AI AJ STEP 19 Use Space Blocks and Hex Nuts to attach Central Rail to Frames Central Rail Cap is installed when Screens Storage installation is not specified Otherwise please save it for the future installation AE1 AK3 AK3 AK1 BH3 Power Cut Out Worksurface WWWRP with Power Access D...

Page 17: ...Section Description Page No Date INSTALL REMAINING WORKSURFACES AS SPECIFIED Feb 2017 17 of 17 INT_002a STEP 21 Proceed with remaining worksurfaces as per specification WWWRP AI AK interpret ...

Reviews: