background image

Section:
Description:

Page No:

Date: 

dossier 

Installation Guides

H.A Credenza (ZJHC)

A

H

D

E

I

P

Q1

J

M

O

U

W1

W3

S

R

HEIGHT ADJUSTABLE CREDENZAS

HEIGHT ADJUSTABLE CREDENZA INSTALLATION

Sept 2018

 1 of 14

DOS_110

Rev. No.: 0

Summary of Contents for Dossier

Page 1: ...n Description Page No Date dossier Installation Guides H A Credenza ZJHC A H D E I P Q1 J M O U W1 W3 S R HEIGHT ADJUSTABLE CREDENZAS HEIGHT ADJUSTABLE CREDENZA INSTALLATION Sept 2018 1 of 14 DOS_110 Rev No 0 ...

Page 2: ...1 0637 x8 O YEPD Power Bar Bracket A16 5298 x1 R W S Wire Manager B03 2380 x1 Q1 W M Bracket A16 5047 x1 Q2 1 4 20 T S D06 4093 x1 P Power Bar YEPD x1 S Tek Pier Switch I04 0098 x1 W2 Cable Manager A16 3980E x1 W3 Cable Tie B02 0545 x2 W3 E Chain Body B02 0648 x1 G 50 mm Murakoshi Bolt x12 Q Wiretray Mounting Bracket Ass N09 6712 x2 W T Mounting Bracket N09 6929 x1 W E Chain N09 6918 x1 Part and P...

Page 3: ...ate SCREW BRACKET TO LEG Sept 2018 3 of 14 DOS_110 HEIGHT ADJUSTABLE CREDENZAS HEIGHT ADJUSTABLE CREDENZA INSTALLATION dossier Installation Guides STEP 1 Place bracket on top of Height Adjustable Leg and use Screws to secure D A C ...

Page 4: ...nnect Credenza to power and raise to maximum height Section Description dossier Installation Guides RAISE LEGS FASTEN BRACKETS TO WORKSURFACE B B D HEIGHT ADJUSTABLE CREDENZAS HEIGHT ADJUSTABLE CREDENZA INSTALLATION Page No Date Sept 2018 4 of 14 DOS_110 Rev No 0 ...

Page 5: ...and Wire Loom beneath Work Surface Section Description dossier Installation Guides ASSEMBLE WIRE MANAGEMENT L Q1 Q3 Q1 L HEIGHT ADJUSTABLE CREDENZAS HEIGHT ADJUSTABLE CREDENZA INSTALLATION Page No Date Sept 2018 5 of 14 DOS_110 Rev No 0 ...

Page 6: ...ets STEP 5 Insert Control Box into cut out beneath Work Surface Section Description Page No Date INSERT CONTROL BOX SECURE CONTROL BOX DOS_110 6 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides M J N ...

Page 7: ...R Sept 2018 7 of 14 DOS_110 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides STEP 7 Remove and discard mounting clips from YEPD Power Bar and secure beneath Worksurface using YEPD Power Bar Bracket P O N ...

Page 8: ...r left or right handed orientation STEP 10 Run Tek Pier Switch Cable through channel in Worksurface and fasten in place with Work Surface Wire Manager Section Description Page No Date ATTACH REINFORCEMENT BAR ATTACH SWITCH FASTEN CABLE DOS_110 8 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides E B T S N R ...

Page 9: ... Chain Grommet STEP 11 Remove Access Panel Section Description Page No Date REMOVE ACCESS PANEL BRING POWER INTO BASE DOS_110 9 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides ...

Page 10: ...fasten with screws STEP 13 Feed YEPD Power Cable into E Chain Section Description Page No Date INSTALL POWER CORD INSTALL E CHAIN TO RUNOFF DOS_110 10 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides W4 W3 K ...

Page 11: ...es with Cable Tie Wrap install Clip as shown and fasten with screws Section Description Page No Date FASTEN E CHAIN TO WORKSRUFACE FASTEN E CHAIN TO BASE DOS_110 11 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides W1 K K ...

Page 12: ...NAGEMENT TRAY FASTEN WIRE MANAGEMENT TRAY DOS_110 12 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZAS HEIGHT ADJUSTABLE CREDENZA INSTALLATION dossier Installation Guides I Q2 STEP 17 Slide Wire Manager into Wire Manager Bracket and Fasten in place using 1 4 20 Thumb Screws 2 places ...

Page 13: ... STEP 18 Drill holes into cabinets using holes in gables as a guide Section Description Page No Date DRILL CONNECTION HOLES FASTEN GABLE TO CABINETS DOS_110 13 of 14 Sept 2018 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides F G ...

Page 14: ...Section Description Page No Date CLOSE ACCESS PANEL Sept 2018 14 of 14 DOS_110 HEIGHT ADJUSTABLE CREDENZA INSTALLATION HEIGHT ADJUSTABLE CREDENZAS dossier Installation Guides ...

Reviews: