background image

A90B

Via Bonazzi, 4 - 40013 Castel Maggiore (BO) 

Tel. +39 051 700096 (10 linee) - Fax +39 051 700175 

[email protected] - www.tecnotelai.it

!

/

!

1 2

 

BANCHI VENDITA 

installation and maintenance instructions

BEFORE  USING  THE  CABINETS 

check  the  floors,  which  must  be  in  good  condition  and  must  have  an 

appropriate consistency for their capacities. In the case of floors with slight unevenness, shim the cabinets and 
check the proper operation of the locks.

FLOOR MOUNTING 

is necessary in order to maintain the capacity of the drawers unchanged.

MAKE SURE THE KEY IS IN OPENING POSITION BEFORE CLOSING THE DRAWERS.

THE OPENING AND CLOSING OF DRAWERS must be done with only one drawer at a time.

Reviews: