![Techroutes TSR 2800-10C Hardware Installation Manual Download Page 7](http://html1.mh-extra.com/html/techroutes/tsr-2800-10c/tsr-2800-10c_hardware-installation-manual_1070865007.webp)
TSR 2800-10C Hardware Installation Manual
- 5 -
Chapter 2 Installation Preparation
2.1 Caution of Usage
Similar to other electronic products, the semiconductor chip easily gets damaged if you power
on or off abruptly and frequently. To restart up the router of TSR 2800-10C, you have to open the
power on-off after the power is cut down for three to five seconds.
Avoid severe collision or falling down from the height to protect the parts in the router.
Do not insert the Ethernet plug into the console port (RJ11 4-line socket). Similarly, do not
insert the console cable into the console port (RJ45 8-line socket).
Note:
1) When the lifetime of our products ends, handle them according to national laws and
regulations, or send these products to our company for collective processing.
2.2 Safety Advice
2.2.1 Safety Principles
Keep dustless and clean during or after the installation.
Put the cover at the safe place.
Put tools at the right place where they are not easily falling down.
Put on relatively tight clothes fasten the tie or scarf well and roll up the sleeve,
avoiding stumbling the machine box.
Put on the protective glasses if the environment may cause damage to your eyes.
Avoid incorrect operations that may cause damage to human or devices.
2.2.2 Safety Notices
The safety notices mentioned here means that improper operation may lead to body damage.
Read the installation guide carefully before you operate the system.
Only professionals are allowed to install or replace the router.
Pull out the AC power socket and close the direct-current power before operating on
the machine box or working beside the power supply.
The final configuration of products must comply with relative national laws and
regulations.