- This section describes procedures for checking the operation of
the major printed circuit boards and replacing the main
components.
- For reassembly after operation checks or replacement, reverse the
respective procedures. Special reassembly procedures are
described only when required.
/
5.1. Checking for the AC IN P.C.B.
- Check the AC IN P.C.B. as shown below.
5.2. Checking for the operation P.C.B.
- Follow the (Step 1) - (Step 3) of item 5.1.
5
Summary of Contents for RS-EH760
Page 7: ...7 ...
Page 8: ... Check the main P C B as shown below 8 ...
Page 30: ...R944 ERDS2FJ222 1 4W 2 2K 1 30 ...
Page 32: ...16 Cabinet Parts Location 17 Packaging 32 ...
Page 33: ...F000400000YM KH 33 ...