10
7
LEVEL ASSEMBLY IN TWO SECTIONS
When the level gauge is delivered in two sections, due to its total length, the following
instructions must be followed carefully for its correct installation.
The numbering of the different elements corresponds to the different figures.
NOTE: Handle the glass tube sections with care.
7.1
Model LT106 (stainless steel)
Fix the lower half of the level to the installation.
Remove the adhesive tape from the lower glass tube (5) and loosen the 3 screws DIN933
M5 x 30 (4) without removing the nuts (2).
In case there is not enough space to introduce the float (6) through the lower part of the
gauge body once the assembly is completed, the float must be in its correct position inside
this lower half at the time of installation.
NOTE: The clamp (1) that fixes the guide-support (3) should never be loosened.
DETAIL A
Summary of Contents for LT106
Page 1: ...R MI LT Rev 3 english version Instructions manual The art of measuring Series LT Level gauge...
Page 42: ...42 All dimensions in mm LTL APR LT APR LT AMM AMD LTL AMM AMD...
Page 43: ...43 LT AAR All dimensions in mm LT xxx ADF LTL xxx ADF...
Page 44: ...44 22 ATEX CERTIFICATE...
Page 45: ...45...
Page 46: ...46 23 ATEX DECLARATION OF CONFORMITY...
Page 47: ...47...