3.
Installation
2011-09
Instructions for Use for INFINITE M1000 PRO No. 30064852 Rev. No. 1.0
21
3. Installation
3.1 Unpacking
&
Inspection
3.1.1
Inspection of Delivered Packaging
The delivered packaging includes the following:
•
OOB Quality Report
•
Final test protocol
•
Software (disk or CD-ROM)
•
Cables (USB 2.0 and main)
•
Transport lock (mounted)
•
This Instructions for Use for INFINITE M1000 PRO and the IFU for i-control
Each injector module packaging includes the following:
•
Bottle
holder
•
Beaker for priming
•
125 ml bottle (light protective)
•
15 ml bottle (light protective)
•
Injector dummy (mounted)
•
Waste tub for plate carrier
3.1.2 Unpacking
Instructions
Before installing abide by the following instructions:
1. Visually inspect the container for damage before it is opened.
Report any damage immediately.
2. Select a location to place the instrument that is flat, level, vibration free, away
from direct sunlight, and free from dust, solvents and acid vapors. Allow at
least 10 cm distance between the back of the instrument and the wall or any
other equipment. Ensure that the plate carrier and injector carrier cannot be
accidentally hit when moved out. Ensure that the main switch and the main
cable can be reached at all times and are in no way obstructed.
3. Place the carton in an upright position and open it.