)(
Quick Guide
Preliminary Work
7
Operation - Daily Routines
For detailed instructions, refer to the
)(
Operator’s
Manual, p/n 391 400
.
Safety Instructions
The Safety Instructions must strictly be followed. Refer to
Chapter: Safety Instructions on page 3
and to the special in-
structions in the corresponding chapters in the
)(
Operator’s Manual, p/n 391 400.
Preliminary Work
Preliminary Checks
•
Ensure that the Daily Preventive Maintenance upon shut-
ting down the System is done.
•
Ensure that all Containers for Disposables are refilled and
all wastes are emptied. Refer to the corresponding des-
cription in the
Chapter: Refilling and Disposal on page 21
•
Make sure four Centrifuge Buckets are placed on the
Worktable, correctly oriented. Check also the Buckets in
the Centrifuge.
•
Check the orientation of the Buckets on the Worktable and
in the Centrifuge.
•
Ensure that all doors, the drawers and the front Panel are
closed.
Starting
1
If necessary, refill DiTi, Secondary Tubes, Labels, and
empty the Wastes.
2
Switch on the power on the right side of the instrument
n
.
3
Start the Application Software. After starting, the instru-
ment will initialize.
CAUTION
•
Turn-off all cell phones and pagers.
•
Before starting, make sure that the Daily Main-
tenance has been carried out properly. Refer to
the
)(
Operator’s Manual, p/n 391 400.
•
After switching off the instrument, wait a mini-
mum of 10 seconds before starting it again.
1
Summary of Contents for GENESIS FE500
Page 31: ...Quick Guide Error Box 31 Notes...