![Teamline 5250 Installation Manual Download Page 27](http://html1.mh-extra.com/html/teamline/5250/5250_installation-manual_3984620027.webp)
Teamline 5250
Page 27
Teamline 5250 safety and compliance information
Pin
Function
Direction on the Teamline system
5
GND
-
6
RX
Input
7
DTR
Output
8
DSR
Input
Cable color information
If you are using cable extenders with VISCA cables, refer to the following pin
color information.
From the Teamline system:
n
White is transmit
n
Green is ground
n
Red is receive
From the camera:
n
White is receive
n
Green is ground
n
Red is transmit
Teamline 5250 safety and compliance information
For legal information, including the privacy notice, end user license
agreement, and GDPR compliance, go to
https://support.starleaf.com/legal-information/
Installation
Read the installation information on this page before you connect the
Teamline 5250 to its power source.
Install the Teamline 5250 only in accordance with the installation instructions.
Ventilation
Do not block any of the ventilation openings of the Teamline 5250.
The Teamline 5250 uses side-to-side cooling fans. Allow an adequate space
on the sides of the unit to promote a good air flow for cooling of the Teamline
5250. Do not block the fan inlet or outlets. Ensure that the fan intake is not
placed inline with the outlet from any other fan or convection cooled device.