SX28-72 Flange Facing Machine
23
5.2 SETTING UP THE EQUIPMENT
The following instructions are for installing the flange facing and grooving machine in position
prior to operating the equipment. It is assumed that an appropriate air supply is available for
connection to the machine (1.8 m
3
/min, 6.0 bar, 64 cfm, 87 psi).
5.2.1 Unpacking the machine
Fig. 10 Packing case contents
PACKING CASE CONTENTS
The machine and its associated equipment are housed in a transportable wooden
case. This case contains the following:
1. The TEAM
®
SX2872 machine
2. Centre spigot
3. M16 eyebolt (4 off)
4. Air pipe and air control valve
Summary of Contents for SILK SX28-72
Page 55: ...SX28 72 Flange Facing Machine 54 Fig 30 Main drive assembly ...
Page 59: ...SX28 72 Flange Facing Machine 58 Fig 31 Surfacing arm assembly ...
Page 61: ...SX28 72 Flange Facing Machine 60 Fig 32 Gearbox assembly ...
Page 64: ...SX28 72 Flange Facing Machine 63 Fig 33 Base assembly ...
Page 66: ...SX28 72 Flange Facing Machine 65 Fig 34 Toolpost assembly ...
Page 68: ...SX28 72 Flange Facing Machine 67 Fig 35 Base centraliser ...
Page 70: ...SX28 72 Flange Facing Machine 69 Fig 36 Counter balance ...
Page 73: ...SX28 72 Flange Facing Machine 72 TYPES OF TOOL BIT FOR GENERAL PURPOSE AND FINE FINISH ...
Page 74: ...SX28 72 Flange Facing Machine 73 TOOLS FOR V GROOVE PLUNGE MACHINING ...
Page 78: ...SX28 72 Flange Facing Machine 77 APPENDIX C V GROOVE MEASUREMENT ...
Page 79: ...SX28 72 Flange Facing Machine 78 ...
Page 80: ...SX28 72 Flange Facing Machine 79 APPENDIX D AIR MOTOR MANUFACTURERS INFORMATION ...
Page 81: ...SX28 72 Flange Facing Machine 80 ...
Page 82: ...SX28 72 Flange Facing Machine 81 ...
Page 83: ...SX28 72 Flange Facing Machine 82 ...
Page 84: ...SX28 72 Flange Facing Machine 83 ...
Page 85: ...SX28 72 Flange Facing Machine 84 ...
Page 92: ...SX28 72 Flange Facing Machine 91 APPENDIX F BEARING LUBRICATION RU40035UU ...