114-101088
Step 6
Position the INNER CRIMP FERRULE next to the SCHIELDING BRAID (Figure 9).
Slide first SHIELD on the RECEPTACLE HOUSING until it snaps on it (Figure 9).
Figure 9
Slide second SHIELD on the RECEPTACLE HOUSING until it it stops (Figure 10).
Figure 10
Position the INNER CRIMP FERRULE into the SHIELDS until it lies against the end of the SHIELDS
(Figure 11).
Put the SHIELDING BRAID over the SHIELDS (Figure 11).
Push the OUTER CRIMP FERRULE over the SCREENING BRAID and the SHIELDS (Figure 11).
Rev B1
11 of
19