409-35009
Rev E
35 of 44
Operation of the new manual clamp
To load the cable:
1. Position the cable.
2. Lift the handle. Springs close the jaws.
To unload the cable:
1. Push down fully on the handle to open the jaws. The jaws remain open.
2. Remove the cable.
7.4.
Automatic cable clamp
The automatic cable clamp is available on certain die holders for use on the
HV-20 terminator only
. See
Cable clamp installation
1. Mount the die holder with the cable clamp in the terminator.
2. Route the air lines as shown in Figure 28 and Figure 29.
Figure 28: Routing the air lines (terminator frame and guards not shown for clarity)
1
Main air valve
2
Air feed/vacuum valve
3
Clamp valve
4
Route air lines similar to figure