11/2012
3
TCS TürControlSysteme AG,
www.tcsag.de
Subject to technical changes.
TCS Hot
line • Mail: [email protected]
PI_AVU940x0-uk
Scope of delivery
1 x ASU940x0 (incl. flush-mount box)
1 x win:clip
TM
key
1 x screwdriver with round-handle
name fields, empty and with light symbol
hexagon socket screws
(to mount the device in the flush-mount box)
product information
Safety instructions
General safety regulations
!
Attention! Installation, mounting, commissioning and repair of electrical devices have
to be carried out only by qualified electricians. The current standards for the installa-
tion of door communication systems must be observed.
When working in systems with 230 V mains voltage, the safety requirements according to
DIN VDE 0100 must be observed.
When installing TCS:BUS systems, the general safety regulations for telecommunication
systems according to VDE 0800 must be observed. Inter alia:
separated cabling of heavy and low current lines,
minimum distance of 10 cm for common cabling,
use of separators between heavy and low current lines in shared cable ducts,
use of standard telecommunication lines, e.g. J-Y (St) Y with 0.8 mm diameter,
existing lines (modernisation) with deviating cross sections can be used in compliance
with the loop resistance.
Installation
– protective measures
!
With suitable requirements to protect against lightning, it has to be ensured that a volt-
age of each 32 V DC is not to be exceeded at the connections
+
and
–
.