background image

Contents

Introduction..........................................................................1.

Shipping.and.Receiving......................................................1.

Handling...............................................................................1.

Short.Term.Storage............................................................1

Long.Term.Storage............................................................1.

Foundations.and.Supporting.Structures...........................2.

Fan.Installation....................................................................3.

Assembly.of.Fans.and.Sealing/Isolation.Strips...............3.

Fan.Operation.–.Safety......................................................3.

Operation.Checklist.............................................................4

Maintenance.of.Fans..........................................................4.

. . General.Motor.Maintenance..........................................4.

. . Wheel.and.Shaft.Maintenance......................................5.

. . Structural.Maintenance..................................................5.

Troubleshooting.Guidelines................................................5

Troubleshooting.Performance.Problems

. . Air.Capacity.Problems...................................................5

. . Noise.Problems..............................................................5

. . Vibration.Problems.........................................................5.

. . Motor.Problems..............................................................5.

Limitation.of.Warranties.and.Claims................................6

Introduction

The. purpose. of. this. manual. is. to. provide. instructions.

that.complement.good.general.practices.when.installing.

or. operating. fans. manufactured. by. Twin. City. Fan. &.

Blower.. It. is. the. responsibility. of. the. purchaser. to.

provide.qualified.personnel.experienced.in.the.installation,.

operation,.and.maintenance.of.air.moving.equipment.

. Instructions. given. in. the. body. of. this. manual. are.

general. in. nature. and. apply. to. a. variety. of. models.

manufactured. by. Twin. City. Fan. &. Blower.. Most. units.

can. be. installed. and. maintained. with. the. instructions.

given.

. Special. applications. may. require. additional. information..

These. instructions. are. supplied. in. the. form. of. attached.

appendices.. Use. the. instructions. in. the. appendix. if. the.

directions. in. this. manual. differ. from. instructions. in. the.

appendix.

. As. always,. follow. good. safety. practices. when.

installing,. maintaining. and. operating. your. air. moving.

equipment..A.variety.of.safety.devices.are.available..It.

is.the.user’s.responsibility.to.determine.adequate.safety.

measures.and.to.obtain.the.required.safety.equipment.

Shipping and Receiving

All. Twin. City. Fan. &. Blower. products. are. carefully.

constructed.and.inspected.before.shipment.to.insure.the.

highest.standards.of.quality.and.performance.

. Compare. all. components. with. the. bill. of. lading. or.

packing.list.to.verify.that.the.proper.unit.was.received.

. Check. each. unit. for. any. damage. that. may. have.

occurred. in. transit.. Any. damage. should. be. reported.

immediately. to. the. carrier. and. the. necessary. damage.

report.filed.

Handling

Handling. of. all. air. moving. equipment. should. be.

conducted.by.trained.personnel.and.be.consistent.with.

safe. handling. practices.. Verify. the. lift. capacity. and.

operating.condition.of.handling.equipment.

. Units. shipped. completely. assembled. may. be. lifted.

with.slings.and.spreader.bars..Use.well-padded.chains,.

cables. or. nylon. straps.. On. most. units,. lifting. lugs. are.

provided.for.attaching.chains.(see.Figure.1)..Lift.the.fan.

in.a.fashion.that.protects.the.fan.and.fan.coating.from.

damage..Never.lift.a.fan.by.the.inlet.or.discharge.flange,.

shafting.or.drives,.wheel.or.impeller,.motor.or.motor.base,.

or.in.any.other.manner.that.may.bend.or.distort.parts.

©2010.–.2018.Twin.City.Fan.Companies,.Ltd.

ES-110

February 2012

MPQN/MPQS Modular 

Plenum Fans

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Maintain  handling  equipment  to  avoid  serious 

personal injury.

CAUTION

Throughout.this.manual,.there.are.a.number.of.HAZARD.WARNINGS.that.must.be.read.and.adhered.to.in.order.

to.prevent.possible.personal.injury.and/or.damage.to.equipment..Two.signal.words."WARNING".and."CAUTION".

are.used.to.indicate.the.severity.of.a.hazard.and.are.preceded.by.the.safety.alert.symbol.

.

WARNING

Used.when.serious.injury.or.death.MAY.result.from.misuse.or.failure.to.follow.specific.instructions.

.

CAUTION

Used.when.minor.or.moderate.injury.or.product./.equipment.damage.MAY.result.from.misuse.or.failure.to.follow.

specific.instructions.

NOTICE

Indicates.information.considered.important,.but.not.hazard-related.

It.is.the.responsibility.of.all.personnel.involved.in.installation,.operation.and.maintenance.to.fully.understand.the....

. Warning.and.

Caution.procedures.by.which.hazards.are.to.be.avoided.

Summary of Contents for MPQN

Page 1: ...f quality and performance Compare all components with the bill of lading or packing list to verify that the proper unit was received Check each unit for any damage that may have occurred in transit Any damage should be reported immediately to the carrier and the necessary damage report filed Handling Handling of all air moving equipment should be conducted by trained personnel and be consistent wi...

Page 2: ...d replenished with fresh grease as per the lubrication decal The motor should be measured to verify that the resistance is still at a satisfactory level compared to the value recorded prior to storage Foundations and Supporting Structures Floor mounted fans should be installed on a flat level surface with sufficient structure support Support shall be suitable for static and dynamic loads and found...

Page 3: ...installation rubber strips need to be installed between each fan Use double sided foam tape to hold strips in place during installation Two 2 to three 3 pieces of tape can be used as needed for this purpose each end and middle of rubber strip Location of these strips is documented in Figure 2 3 The first fan on the bottom row will have the 2 vertical strips placed next to the mounting holes Note S...

Page 4: ...t is operating properly Run unit up to speed Verify fastener tightness These may have loosened during shipment or installation Setscrews attaching wheel hub to shaft Nuts on inlet funnel Nuts and bolts holding motor Nuts holding housing frame to base and base to ground Bolts in taper lock bushings Grease line connections After one week of operation check all nuts bolts and setscrews and tighten if...

Page 5: ...k air performance measurement techniques procedures 4 Devices for air modulation are closed or plugged Also check filters 5 Wheel mounted improperly or is rotating in reverse 6 Parts of system or fan have been damaged or need cleaning Noise Problems 1 Air performance is incorrect and fan is not at design point of operation Fan forced to operate in an unstable flow region 2 Bearing failure Check be...

Page 6: ...uring such period provided that a seller is notified in writing within ten 10 days following discovery of such defects by buyer or within ten 10 days after such defects should reasonably have been discovered whichever is less b the defective unit is returned to seller transportation charges prepaid by buyer c payment in full has been received by seller or said products and d seller s examination o...

Page 7: ...Twin City Engineering Supplement ES 110 7 ...

Page 8: ...ITY FAN BLOWER WWW TCF COM 5959 Trenton Lane N Minneapolis MN 55442 Phone 763 551 7600 Fax 763 551 7601 Visit www tcf com to view all of Twin City Fan Blower s Installation Manuals and Fan Engineering Topics ...

Reviews: