SP60/SP80 User Manual V1.3
TBB Power Co.,Ltd
29
5.3 Setting Page and Configuration
This page contains the necessary configuration involved with this equipment. Pressing “UP” or
“DOWN” button, you can choose your setting page and pressing “ENTER” button to enter into this
page.
The configuration involved with:
Basic system configurations:
Language, Change Password, Date and Time
Battery Capacity, Battery Type, Battery Low Voltage Level, Max Charger Rate
Battery Equalization Charging reminder
PV array voltage, PV array power, PV&SP identification
Auxiliary output
Advanced system configurations:
Charger constant voltage (absorption stage)
Constant voltage timer
Charger floating voltage
Temperature compensation rate
Charger Equalization voltage
Charger Equalization timer
It is important to finish the basic configurations listed below to assure the right
performance and display of this equipment. Some setting such as battery type is
compulsory to finish.