Kinergier Pro User Manual
13
4. Configuration
4.1 Check before Operation
Please check before operation according to the following.
Inverter is installed correctly and steady.
Reasonable cable layout to meet customer requirements.
Make sure the grounding is reliable.
Make sure the ground wire is properly connected and firm and reliable.
Double check the battery breaker is OFF.
Make sure the cables are properly connected, firm and reliable.
Reasonable installation space, clean and tidy environment, no construction residue.
4.2 Power ON Test
Make sure the battery voltage is within the permissible range before turning
ON the breaker.
Please follow the following instruction step by step.
Step 1: Turn on the circuit breaker between the battery and the inverter.
Step 2: Press the On/Off button to turn on the inverter to enter self diagnostic.
Step 3: Set the parameters following the setup wizard.
Step 4: Press the On/Off button again to turn on the inverter.
Step 5: Observe the LED light to make sure the inverter is running normally.
(refer to Tab 2-2 LED directive function)
4.3 Power OFF
After the inverter is power OFF, there is still residual power and heat in the
chassis, which may lead to electric shock or burn. Therefore, after the
MPPT charger is powered off for 5 minutes, you should wear protective
gloves before removing the MPPT charger.
Method 1: Press the On/Off button about 2secs to turn off the output of inverter. Afterwards,
you can press and hold the On/Off for 5secs, after hearing consecutive beep, you can
permanently shut down the inverter.
Method 2: Press and hold the On/Off for 5secs, after hearing consecutive beep, you can
permanently shut down the inverter straight away.