![Taylor PH61 Operator'S Manual Download Page 63](http://html.mh-extra.com/html/taylor/ph61/ph61_operators-manual_822773063.webp)
Section 9
9-1
PH61 Peristaltic Pump
Parts Replacement Schedule
9
Parts Replacement Schedule
Table 9-1
Part Description
Every 3 Months
Every 6 Months
Annually
Scraper Blade-Shake
X
Driveshaft Seal
X
Freezer Door O-ring-Shake
X
Front Bearing
X
Draw Valve O-ring
X
Spinner Shaft Seal-Shake
X
Pivot Pin O-ring
X
Restrictor Cap-Shake
X
Mix Feed Tube O-ring
X
Pump O-ring
X
Mix Inlet Tube O-ring
X
Mix Feed Tube Check Ring
X
Air Inlet Fitting Seal
X
Pump Driveshaft O-ring
X
Pump Valve Gasket
X
White Bristle Brush, 3” x 7”
Inspect and replace if
necessary.
Minimum
Peristaltic Pump Tubes
Inspect and replace if
necessary.
Minimum
White Bristle Brush, 1-1/2” x 2”
Inspect and replace if
necessary.
Minimum
White Bristle Brush, 1” x 2”
Inspect and replace if
necessary.
Minimum
Black Bristle Brush, 1” x 2”
Inspect and replace if
necessary.
Minimum
Double-Ended Brush
Inspect and replace if
necessary.
Minimum
Door-spout Brush
Inspect and replace if
necessary.
Minimum
Brush Set (3)
Inspect and replace if
necessary.
Minimum
Summary of Contents for PH61
Page 8: ...1 4 TO THE INSTALLER PH61 Peristaltic Pump To the Installer 1 Notes ...
Page 14: ...3 4 SAFETY PH61 Peristaltic Pump8 Safety 3 Notes ...
Page 32: ...5 10 USER INTERFACE PH61 Peristaltic Pump User Interface 5 Notes ...
Page 56: ...6 24 OPERATING PROCEDURES PH61 Peristaltic Pump Operating Procedures 6 Notes ...
Page 64: ...9 2 PARTS REPLACEMENT SCHEDULE PH61 Peristaltic Pump Parts Replacement Schedule 9 Notes ...
Page 72: ...11 4 LIMITED WARRANTY ON PARTS PH61 Peristaltic Pump Limited Warranty on Parts 11 Notes ...