The list of commissioning operations and checks is shown in Table 17 below. Initial state of VCB components
before checks: ISM - open, CM - deenergized. Main circuits of ISM shall be disconnected/isolated from the
main circuits of substation to avoid high voltage being applied to the ISM before the commissioning procedure
completion. Commissioning and maintenance is only permitted for qualified and trained personnel.
Table 17 - List of commissioning operations and check-ups
Operation description
Required tool
Approximate timing
Tests at the end of installation
Check for damage, remove any dirt,
contamination or moisture
Visual check, no tool is required
2 minutes
Unsupported busbar length shall be according to
Table 2 for LD ISM and Table 5 for HD ISM
Ruler, tape measure or calliper - depends on
distance value and place of measurement
execution
2 minutes
Fixing points shall be according to Figure 61-
Figure 67
Visual check, no tool is required
1 minute
Bolts and torques shall be according to Figure
61 - Figure 67
Torque wrench according to torque value
2 minutes
Clearances shall be according to subchapters
Ruler, tape measure or calliper - depends on
distance value and place of measurement
execution
2 minutes
Protective earthing shall be according to
subchapter 4.1.8
Visual check, no tool is required
1 minute
Check that free air circulation at ISM is possible
Visual check, no tool is required
1 minute
Installation of CM shall be according to
subchapter 4.2.4
Visual check, no tool is required
1 minute
Availability of the CM auxiliary power supply. It is
recommended to use the same auxiliary power
supply as for protection and control devices.
Type of voltage and voltage level according to
selected CM type
Voltmeter with measurement range according to
expected power supply voltage value
2 minutes
Polarity of auxiliary power supply and selection
of MCB shall be according to subchapter 4.2.6.
Check of compliance between ISM type on
ISM serial number plate and on CM
designation label
DC voltmeter with measurement range
according to expected power supply voltage
value - for voltage polarity check. Visual check,
no tool is required
– for MCB check
2 minutes
Connection between CM and ISM shall be
according to subchapter 4.2.5
Multimeter - for validation of correct wiring
connections (utilizing the continuity function of
the meter)
5 minutes
Checking that all secondary connections have
been secured adequately
Visual and mechanical check of connections, no
tool is required
2 minutes
Checking whether the CM, ISM are connected
according to project/ product documentation and
according
to circuit diagrams in „Appendix 3.
Secondary schemes“.
Multimeter - for validation of correct wiring
connections (utilizing the continuity function of
the meter)
5 minutes
Summary of Contents for VCB Series
Page 1: ...COMPATIBLE SERIES USER GUIDE...
Page 2: ......
Page 4: ......
Page 5: ...1 Product description...
Page 13: ...13 2 Nameplates and seals...
Page 18: ...18 3 Product handling...
Page 37: ...4 Installation...
Page 87: ......
Page 88: ...5 Commissioning...
Page 94: ...94 Figure 155 The connection points of the contact resistance meter...
Page 95: ......
Page 96: ...6 Operation...
Page 100: ...7 Maintenance and troubleshooting...
Page 105: ......
Page 106: ...8 Disposal...
Page 109: ...109 Appendix 2 Overall Drawings...
Page 112: ...112 ISM15_LD_3 Weight 13 kg ISM15_LD_6 PCD 133 mm Weight 55 kg...
Page 113: ...113 ISM15_LD_8 PCD 210 mm Weight 26 kg...
Page 114: ...114 ISM15_MD_1 150_L PCD 150 mm Weight 33 kg ISM15_MD_1 210_L PCD 210 mm Weight 35 kg...
Page 115: ...115 ISM15_MD_3 Weight 13 kg ISM15_Shell_2 150_L PCD 150 mm Weight 51 kg...
Page 120: ...120 ISM15_HD_1 275 PCD 275 mm Weight 72 kg ISM25_LD_1 210_Par2 PCD 210 mm Weight 36 kg...
Page 123: ...123 ISM25_LD_2 2 PCD 150 mm Weight 37 kg ISM25_LD_3 Weight 14 kg...
Page 125: ...125 Dimensions of Control Module CM_16_1 Par1_Par2_Par3_Par4_Par5 Weight 1 kg...
Page 127: ...127 Dimensions of Interlocking Kits CBkit_Interlock_1 CBkit_Interlock_3...
Page 128: ...128 CBkit_Interlock_4 CBkit_Interlock_5...
Page 129: ...Appendix 3 Secondary Schemes...
Page 130: ...130...
Page 131: ...131...
Page 132: ...132...
Page 133: ...133...
Page 134: ...134...
Page 135: ...135...
Page 136: ...136...
Page 137: ...137...
Page 138: ...138...
Page 139: ...139...
Page 140: ...140...
Page 142: ...Bartlett...