7.1 Primary circuits
Under normal operating conditions (see Table 1) the ISM is maintenance free for a period of at least 30 years
or until it has reached the permissible number of operating cycles.
However when maintenance is carried out on the switchgear then the commissioning tests should be repeated.
Check that the ISM is disconnected from all voltage sources before inspecting its insulating parts. Test results
should be treated as given in Table 18.
Table 18 - List of tests and check-ups of ISM during maintenance
Operation description
Required tool
Approximate timing
Check for damage, remove any dirt, conta-
mination or moisture
Dry napless cloth or a napless cloth soaked
in alcohol to clean the insulation
5 minutes
Bolts and torques shall be according to Figure
61 - Figure 67
Torque wrench according to torque value
2 minutes
Protective earthing shall be according to
subchapter 4.1.8
Wrench if required
1 minute
ISM operation check
Perform close and open operation of the ISM.
Modules shall be operable. Otherwise, check
the control circuit. If necessary, change the
failed module.
Visual check, no tool is required
1 minute
Primary circuits insulation check
1)
Observe safety precautions listed in the danger
and warning advisories. Construct the proper
barrier and warning light system
Equipment to provide safety in test area
10 minutes
Ground each pole not under test
Wires
2 minutes
Apply slowly rising 100%
2)
of test voltage
3)
(50 or 60 Hz) across each pole for one minu-
te
4)
. (ISM is open)
Power frequency withstand voltage test set
2 minutes
If the pole sustains the test voltage for that
period, its vacuum integrity has been verifed
5)
Power frequency withstand voltage test set
-
Repeat actions above to check each pole of the
ISM
Power frequency withstand voltage test set,
wires
8 minutes
Close the ISM. Ground each pole not under test
Wires
1 minute
Apply slowly rising 80% of test voltage
2)
(50 or
60 Hz) between a primary conductor of the pole
and ground for one minute, repeat test for each
pole of ISM
Power frequency withstand voltage test set
12 minutes
If no disruptive discharge occurs, the insulation
system is satisfactory
Power frequency withstand voltage test set
-
After the test, ground all main circuit terminals
to dissipate any static charge
Wires
2 minutes
1)
This test includes not only the vacuum interrupter test, but also the other insulation components tested in parallel with the interrupter. These include
the support insulators and the insulated drive links, as well as the insulating (tension) struts between the upper and lower vacuum interrupter
supports. If these insulation components are contaminated or defective, the test voltage will not be sustained. If so, clean or replace the affected
components, and retest.
2)
For test of separate VCB - 100% level of test voltage, for test of Switchgear with installed VCB - 80% level of test voltage according to
IEC 62271-200.
3)
Rated test voltage levels (Ud) are given in Table 1 above.
4)
To apply test voltage the single-core short cables should be used. Application of high voltage coaxial cables is strictly prohibited. To coordinate the
surge impedance between the test set and ISM extra resistor as shown in Figure 154 shall be used.
5)
During testing of vacuum interrupter, self-fading restrikes may appear. In case of restrikes, reduce the voltage slightly until the restrikes disappear
(for 10-15 seconds) and then increase again.
Summary of Contents for VCB Series
Page 1: ...COMPATIBLE SERIES USER GUIDE...
Page 2: ......
Page 4: ......
Page 5: ...1 Product description...
Page 13: ...13 2 Nameplates and seals...
Page 18: ...18 3 Product handling...
Page 37: ...4 Installation...
Page 87: ......
Page 88: ...5 Commissioning...
Page 94: ...94 Figure 155 The connection points of the contact resistance meter...
Page 95: ......
Page 96: ...6 Operation...
Page 100: ...7 Maintenance and troubleshooting...
Page 105: ......
Page 106: ...8 Disposal...
Page 109: ...109 Appendix 2 Overall Drawings...
Page 112: ...112 ISM15_LD_3 Weight 13 kg ISM15_LD_6 PCD 133 mm Weight 55 kg...
Page 113: ...113 ISM15_LD_8 PCD 210 mm Weight 26 kg...
Page 114: ...114 ISM15_MD_1 150_L PCD 150 mm Weight 33 kg ISM15_MD_1 210_L PCD 210 mm Weight 35 kg...
Page 115: ...115 ISM15_MD_3 Weight 13 kg ISM15_Shell_2 150_L PCD 150 mm Weight 51 kg...
Page 120: ...120 ISM15_HD_1 275 PCD 275 mm Weight 72 kg ISM25_LD_1 210_Par2 PCD 210 mm Weight 36 kg...
Page 123: ...123 ISM25_LD_2 2 PCD 150 mm Weight 37 kg ISM25_LD_3 Weight 14 kg...
Page 125: ...125 Dimensions of Control Module CM_16_1 Par1_Par2_Par3_Par4_Par5 Weight 1 kg...
Page 127: ...127 Dimensions of Interlocking Kits CBkit_Interlock_1 CBkit_Interlock_3...
Page 128: ...128 CBkit_Interlock_4 CBkit_Interlock_5...
Page 129: ...Appendix 3 Secondary Schemes...
Page 130: ...130...
Page 131: ...131...
Page 132: ...132...
Page 133: ...133...
Page 134: ...134...
Page 135: ...135...
Page 136: ...136...
Page 137: ...137...
Page 138: ...138...
Page 139: ...139...
Page 140: ...140...
Page 142: ...Bartlett...