VERTICAL TOWED MIXER - TWO AUGERS
VD SERIES
Tatoma Ag Equipments Corp. Located in Colcord, OK. Phone (918) 422-4271
- 65 -
MAINTENANCE OPERATIONS
Maintenance operations should be carried out by the mixer user
The following are the basic maintenance operations that must be performed by the
mixer user:
Maintenance operations
First
Periodicity
Checking levels
Check hydraulic oil level
15 hours
Weekly
Check auger redactor oil level
Check 2-speed gearbox oil level
Grease
Grease the indicated points
Weekly
Filters
Control the clogging of the hydraulic circuit filter
Daily
Wheels and tires
Check the tire pressure
Weekly
Check the tightness of the wheel bolts
Start-up
Monthly
Check for the presence of embedded objects in the tire
thread
Weekly
Check for cuts or cracks in the tire sidewalls
Battery
Check the condition of the terminals
Quarterly
Control the electrolyte level and battery charge
Tub & Auger
Check wear of auger blades
Monthly
Check the tightness of the bolts in the auger blades
Cleaning the interior of the tub
Unloading conveyor
Cleaning of the unloading conveyor
Weekly
Check & adjust the tension of the chain in the unloading
conveyor
Monthly
Hydraulic installation
Visual control of the hydraulic hoses
Weekly
Visual control of leakages
Check the tightness of the hydraulic hose clamps
Quarterly
Electrical installation
Checking the lighting & signaling system
Weekly
Checking the scales
Monthly
Calibration of the scales (1)
Yearly
(1) The calibration of the scales should be done by TATOMA