background image

5.  Use the buckle tighteners to achieve high tension. Adjust the arch 

positioning and restake as necessary to ensure ridgeline and sidewalls are 

taut.  Floor tension is also controlled using strap tighteners.

Entry/Exit

Entry and exit are through the zippered 

vestibule door and interior mesh zippered 

door. Use the tiebacks to open and secure 

the vestibule door. The mesh door unzips 

and secures via a tieback loop and clip

The vestibule also detaches from the 

stakes. Unclip the buckle, roll the fabric 

back, and tie back against the sleeve. Use 

the interior arch tension straps to maintain a taut 

pitch when the vestibule is detached.

For full end-to-end ventilation, open and roll back both vestibules.

Tarptent Cloudburst 3 Basic Setup

Basic setup is very easy. It will take about 2 minutes once you get the hang of it.  

For additional photos, see the Cloudburst 3 product page on tarptent.com
1.  Spread canopy on ground, black floor side down. Remove stakes from stake 

bag and have ready.  

2.  Assemble arch poles. Pole lengths are 120in / 3.05 m.

3.  Locate a yellow pole sleeve and thread a pole where the sleeve opens.  Push 

the pole through the sleeve and insert the pole tip into the pole tip pocket.  

Pull the fabric to slide the sleeve across the pole and insert the pole tip into 

the other pole tip pocket. Tighten strap. Repeat at other pole sleeve.

4.  Now lift an arch and align it vertically. Stake through O-ring at bottom of 

vestibule edge as shown below. Be sure to relax the tension strap to allow 

plenty of room for tightening. Repeat at other O-ring. Now repeat at other 

arch. Be sure both arches are vertical and parallel to each other. 

O-ring

tension

Reviews: