background image

 

Tarana Wireless, Inc. ©2021.  All rights reserved. 

 

RN Installation Guide vIG_RN_CBRS_2021-08  

  10 

Physical Installation 

Mounting 

RN Chassis Bracket Assembly 

The chassis bracket is attached directly to the RN unit prior to mounting on the 
elevation bracket.  

Step 1.

 

Align the screw holes of the chassis bracket with the 4 threaded holes 
on the back of the RN. 

Step 2.

 

Using an 8mm hex socket wrench, install the four screws.  

Step 3.

 

With the bracket in the final position, torque 4 bolts with incremental 
steps at approximately 40%, 70%, and 100% of full torque rating:  

 

Following the torque sequence 1-2-3-4 shown below, torque all bolts to 
values of approximately 40% (2.4 N-m or 1.7 lb-ft). 

 

Continue with the same sequence for all bolts at approximately 70% (4.2 
N-m or 3 lb-ft). 

 

Repeat the torque sequence for all bolts until each bolt is stabilized at 6 
N-m (4.4 lb-ft). 

Step 4.

 

Partially install one screw on each elevation attachment tab on the 
chassis bracket in the locations closest to the top of the RN unit.  The 
two screws should be screwed into the tabs enough that about 2 threads 
are exposed coming out of the backside of each tab. 

 

 

 

Figure 4: Attaching the Chassis Bracket 

 

Summary of Contents for GIGABIT 1

Page 1: ...Tarana Wireless Inc 2021 All rights reserved RN Installation Guide vIG_RN_CBRS_2021 08 0 Remote Node Installation Guide CBRS vIG_RN_CBRS_2021 08 G I G A B I T 1 PN 18 0010 001 Rev 1 0...

Page 2: ...RYINFORMATION 6 DEPLOYMENT IN THE US FCCSTATEMENT 6 USACBRSBAND CATEGORY BDEVICE 7 PREPARATION 8 TOOLS 8 CUSTOMER SUPPLIED EQUIPMENT 8 TARANA HARDWARE AND PERIPHERALS 9 PHYSICAL INSTALLATION 10 MOUNTI...

Page 3: ...tional controlled limit for maximum permissible exposure MPE is 5 mW cm2 It is estimated that the maximum power density at the radome is 1 25 mW cm2 which is below the FCC MPE limit Since the power de...

Page 4: ...aking adjustments and or modifications to this equipment that are not in accordance with the provisions of this User Guide the Installation Guide or other supplementary documentation may result in per...

Page 5: ...multi antenna site and there is potential for exposure to harmful levels of RF radiation wear a protective suit Grounding Connections Reliable grounding of the RN chassis must be maintained Power Supp...

Page 6: ...Tarana Wireless Inc 2021 All rights reserved RN Installation Guide vIG_RN_CBRS_2021 08 5 Supplier s Declaration of Conformity...

Page 7: ...tion Modifications not expressly approved by Tarana Wireless Inc could void the user s authority to operate the equipment NOTE This equipment has been tested and found to comply with the FCC limits fo...

Page 8: ...B CBSD Citizen Broadband Radio Device which requires the following information be recorded and uploaded as part of the CPI process per section 96 45 All CSBDs Category B Devices Geographic location An...

Page 9: ...are Tools 2 Phillips tip screwdriver 8mm hex socket wrench Torque wrench Crimping tool not shown Laptop with admin rights not shown Figure 1 Tools Customer Supplied Equipment Grounding wire per local...

Page 10: ...BRS_2021 08 9 Tarana Hardware and Peripherals PoE injector 40 60 VDC 1 5A 2 Worm gear clamps Grounding screw Ethernet cable cord grip 8 M5 flanged head screw with thread lock RN chassis bracket RN ele...

Page 11: ...th incremental steps at approximately 40 70 and 100 of full torque rating Following the torque sequence 1 2 3 4 shown below torque all bolts to values of approximately 40 2 4 N m or 1 7 lb ft Continue...

Page 12: ...ps will go around the pole Step 2 Mount the bracket such that the elevation tabs are protruding away from the pole The vertical hanger slots should be on top and the horizontal elevation slots should...

Page 13: ...all as shown apply fasteners at the corners of the bracket to attach to a flush surface wall Do not modify or enlarge the screw holes as this will compromise the corrosion protection of the finish Ste...

Page 14: ...essary to ensure the RN is aimed in the direction of the BN If unsure what direction the BN is relative to the RN a satellite view of the deployment area can assist in determining the proper direction...

Page 15: ...sis Attach a ground wire with an M5 screw onto the enclosure as indicated A ring terminal suitable for the M5 screw should be crimped to the ground wire Step 2 Torque the screw to 6 N m 4 5 lb ft The...

Page 16: ...f the Ethernet cable using a PoE tester Ensure the PoE injector is protected from the elements in a suitable enclosure or installed indoors The total length of both Ethernet cables CAT5e or higher fro...

Page 17: ...Step 8 Power Up the RN Upon receiving power the RN will undergo the power up process There are 3 LEDs on the bottom edge of the RN that will cycle through patterns and colors during this time At the e...

Page 18: ...interface connect a laptop with a 1000 Mbps Ethernet port to the Ethernet port of the PoE powering the RN Step 2 Assign a static IP address of 192 168 10 10 to the laptop s Ethernet port Step 3 Open...

Page 19: ...nected to Tarana Cloud Suite TCS by confirming that the hostname of the RN at the top of the screen is in green text The received signal strength from the BN can also be verified here Note If the BN O...

Page 20: ...MER Except as specified above all express or implied conditions representations and warranties including without limitation any implied warranty or condition of merchantability fitness for a particula...

Reviews: