3. MAINTENANCE
IOM manual Tapflo Metal Series
26
Fig. 3.8.4
When screwing in the diaphragms [15] on the shaft [16],
the holes in the diaphragms must align with the holes
in the centre block [12]. Sometimes it is necessary to
turn the diaphragm back a little bit in order to align the
holes.
Fig. 3.8.5
Apply Loctite on the stopper to secure the screws.
Fig. 3.8.6
For easier assembly of the stoppers you can use an allen
hey and pliers to aid yourself.
Fig. 3.8.7
When fastening the nuts, remember to do it according
to the tightening procedure and with the appropriate
torque.
NOTE!
After a few weeks of operation retighten the
nuts with the appropriate torque.
3.8.1.
Test run
We recommend you to conduct a test run of the pump before installing it in the system, so
no liquid gets wasted if the pump leaks or perhaps does not start accordingly to wrong
assembly of the pump.
After a few weeks of operation retighten the nuts with appropriate torque.
Summary of Contents for Metal Series
Page 32: ...5 SPARE PARTS IOM manual Tapflo Metal Series 32 5 1 3 TX70 TX420 Spare parts drawing...
Page 36: ...5 SPARE PARTS IOM manual Tapflo Metal Series 36 5 1 6 TX820 Spare parts drawing...
Page 40: ...5 SPARE PARTS IOM manual Tapflo Metal Series 40 5 2 3 T220 T420 Spare parts drawing...
Page 44: ...5 SPARE PARTS IOM manual Tapflo Metal Series 44 5 2 6 T820 Spare parts drawing...
Page 51: ...6 DATA IOM manual Tapflo Metal Series 51 Dimensions T820 S...
Page 56: ......