3.5.2 Installation of HCS-5300TDS/80
①
M6×60 hook up riveting bolt
②
M4 screw
(
M4×40
)
and nut
③
User customized suspension (see figure 3.30 for requirements) or HCS-5300TDP suspension (optional length)
④
M3×12 screw
⑤
Hard ceiling (such as concrete ceiling)
Figure 3.27 HCS-5300TDS/80 digital infrared transceiver suspension mounted
Mounting steps:
Step 1:
Fix M6×60 hook up riveting bolt onto the hard ceiling (such as concrete ceiling);
Step 2:
Fix HCS-5300TDS/80 digital infrared transceiver onto the suspension with M3×12
screws;
Step 3:
Pull the M4 screw over the mounting hole at the top of the
suspension and fix it
with M4 nut;
Step 4:
Hang the suspension on M6 hook up riveting bolt.
WARNING:
This installation method is applicable to hard ceiling (such as concrete ceiling),
and when the thickness of the ceiling is greater than the length of M6 screw.
56
Summary of Contents for HCS-5300MA/80
Page 9: ...8 14 Display language list 103 Appendix 104 Dedicated 6 PIN Extension Cable 104 VIII...
Page 32: ...Figure 2 11 System connection Wireless discussion video tracking central control 20...
Page 46: ...Figure 2 17 Audio mode setting External Process Mode2 34...
Page 69: ...Figure 3 28 Requirements of user customized suspension 57...
Page 116: ...Appendix Dedicated 6 PIN Extension Cable 104...