INSTALLATION GUIDE
MADDOX Wall Organizer
com
ponen
ts
Horizontal Bars
STEP 1
: Space horizontal bars (H) with channel facing up
STEP 1
: Space horizontal bars (H) with channel facing up
Vertical Bars
End Caps
Toggler
#10-24 Screws
Posts
Posts
10-24 Screws
1/2`` Drill bit
Allen key 2.5mm
Leveler
Toggler
tools
Allen Key 2.5 mm Allen Drill Bit 3mm
1/2” Drill Bit
Leveler
Jig K
Jig L
(Shop Supplied)
Posts
10-24 Screws
1/2`` Drill bit
Allen key 2.5mm
Leveler
Toggler
Posts
10-24 Screws
1/2`` Drill bit
Allen key 2.5mm
Leveler
Toggler
Posts
10-24 Screws
1/2`` Drill bit
Allen key 2.5mm
Leveler
Toggler
Posts
10-24 Screws
1/2`` Drill bit
Allen key 2.5mm
Leveler
Toggler
install prep
STEP 1
: Space horizontal bars (H) with channel facing up
(included)
(included)
STEP 1
: Space horizontal bars (H) with channel facing up
6”
(included)
Recommended but
not required
Refer to
PART F
for
placement
If installing on
partition replace
F
with #8 wood
screw
60.2913.BW
INSTALL PREPARATION
PART A:
Page 1
WARNING:
This product can
expose you to
chemicals including
chromium (hexavalent
compounds), which
are known to the
State of California to
cause cancer and
birth defects or other
reproductive harm.
For more information,
visit
www.p65warnings.
ca.gov
A
B
C
D
E
F
G
H
I
J
K
L
A
A
A