![TA DTC-300 Getting Started Manual Download Page 18](http://html1.mh-extra.com/html/ta/dtc-300/dtc-300_getting-started-manual_4369174018.webp)
DTC-300 Getting Started Guide
Page 18
Chapter 2:
Installing the DTC-300 System
Unpacking/Repacking
You may wish to retain all of the shipping hardware, the plywood, and boxes from the instrument in the
event you wish to repack and ship your instrument.
Installing the System
Before shipment, the DTC-300 is inspected both electrically and mechanically so that it is ready for opera-
tion upon proper installation. Installation involves the following procedures:
•
Inspecting the system for shipping damage and missing parts
•
Choosing a location for instrument installation
•
Installing the instrument
•
Connecting the utilities
It is strongly recommended that you have your DTC-300 system installed by a TA Instruments Service
Representative; call for an installation appointment when you receive your instrument.
CAUTION: To avoid mistakes, read this entire chapter before you begin installation.
MISE EN GARDE: Pour éviter de commettre des erreurs, lisez tout le chapitre avant de commencer
l'installation.
Inspecting the System
When you receive your DTC-300 system, look over the instrument and shipping container carefully for
signs of shipping damage, and check the parts received against the enclosed shipping list.
•
If the instrument is damaged, notify the carrier and TA Instruments immediately.
•
If the instrument is intact but parts are missing, contact TA Instruments.