
DHR/AR Series Environmental Test Chamber Getting Started Guide
Page 24
Figure 21
ETC with covers removed.
4
Remove the three 3-mm hex head bulkhead screws holding the secondary lighting in place and remove
the unit. Fit the insulated plug in its place.
Figure 22
Removing the bulkhead screws.
5
Remove the three 3-mm nuts holding the main viewer module in place and remove the unit. Fit the
insulated plug in its place.
NOTE
: The location of the stand-offs is shown in the figure below. The actual stand-offs are not visible in
the picture.
Figure 23
Standoff locations.
Bulkhead screws
Locations of stand-offs