4
| Refrigerant Control/Reporting
Fig. 4 Installation with by-pass, left hand unit
Position
Description
Supply air
Exhaust air
Outdoor air
Extract air
1
Exhaust air, By-pass
2
VAV Pressure transmitters (accessory)
3
Damper and motor, outdoor air (accessory)
4
Damper and motor, exhaust air (accessory)
5
Damper and motor, exhaust air by-pass
(accessory)
4
Refrigerant Control/Reporting
Topvex SoftCooler TR comes pre-filled with refrigerants and belongs to the group "Piece units containing more than
3kg refrigerants per circuit". Before commissioning shall always a control report in respect of the installation be estab-
lished by a cooling certified person. Leakage control with record keeping shall be done once per year. The installation of
the Topvex SoftCooler TR is only duty to report if the property/enterprise where the installation occurs, all together
after installation, has a total amount of refrigerants of 10 kg or more ("small Piece units" with refrigerants less than 3
kg, e.g. normal refrigerators/freezers does not includes). Reporting shall in occurring cases be done to major inspection
authority (normally the municipal environmental office).
Different regulations can be valid in different countries. Check with your local government.
208768 | A003
Summary of Contents for Topvex SoftCooler TR09-15
Page 2: ...208768 A003...
Page 4: ......
Page 21: ...208768 A003...
Page 22: ...208768 A003...
Page 23: ...208768 A003...