KPB
Operating Instructions
Page 1: ...KPB Operating Instructions...
Page 2: ...contact the supplier All packing elements palettes plastics staples etc must be thrown to the corresponding recycling binds and in case of not possibility to insure that they are not leave at random s...
Page 3: ...emair will not accept any claim or responsibility for this INSTALLATION AND MOUNTING INSTRUCTIONS The maximum R P M indicated on the technical label of the product must never be exceeded If not the pr...
Page 4: ...therefore the must not be lubricated before the first installation of the product Under normal working conditions bearings must be lubricated after 20 000 working hours or 2 years wathever is first an...
Page 5: ...the installation is suitable for the product electric input According to the safety rules an unipolar switch is required for connection to the electric supply When using products consuming electric en...
Page 6: ...KPB Size Approx weight without min max motor output in kg 9 9 38 10 10 45 12 12 64 15 15 105 18 18 148 20 20 250 22 22 315 25 25 325 30 28 390 6...
Page 7: ...Systemair HVAC Spain S L U C Montecarlo 14 P I Uranga ES 28942 Fuenlabrada Tel 34 0 91 600 29 00 Fax 34 0 91 607 03 09 general systemair es www systemair es...