![SystemAir ECF LN 9 2P Installation And Maintenance Manual Download Page 20](http://html1.mh-extra.com/html/systemair/ecf-ln-9-2p/ecf-ln-9-2p_installation-and-maintenance-manual_1422923020.webp)
A
5 mm
B
14. AIR DISTRIBUTION
14.1. AIR DISTRIBUTION MODULE FITTING
Carefully unpack the module and fit the clips in the frame corners.
For infra red models, connect the flat cable from the receiver.
Present the frame to the unit, and apply pressure so that the clips engage. Then screw
it in place.
Avoid distorsions of the frame caused by excessive traction; the frame should be correctly
centered in relation to the false ceiling and it should especially ensure an airtight
separation between air succion and air discharge.
The seals are illustrated in the diagram below. They avoid:
A
Air by pass
B
Treated air being distributed into the suspended ceilling space.
After installation, check that the gap between the frame and the suspended
ceiling is less than 5 mm.
14.1.1. PLASTIC FACADE
Carefully unpack the module.
For infra red models, connect the flat cable from the receiver.
14.1.2. DIFFUSER IRYS
18
Summary of Contents for ECF LN 9 2P
Page 2: ......
Page 26: ...24...
Page 50: ...24...
Page 74: ...24...
Page 98: ...24...
Page 122: ...24...
Page 123: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO...
Page 129: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO VII 9 2T 12 2T 18 2T 9 4T 12 4T 18 4T...
Page 130: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO VIII AQUANET 9 2T 12 2T 18 2T 9 4T 12 4T 18 4T...