
Caution: Be sure to turn off hot and cold water supplies before
installing or servicing faucet.
Installation
1.
Push faucet supplies with rubber gasket through holes
in sink (make sure gasket [LL-126] is between faucet
and sink). Secure faucet to sink by tightening flange
nuts (LL-125) from underside. (If sink or counter
surface is uneven, use putty or sealant to make proper
seal under base.)
2.
Connect hot supply to left tube and cold supply to
right tube using appropriate connectors.
3.
Pop-up drain installation:
a) Remove pop-up plug, tail piece and flange from the
drain body. Make sure that locknut is threaded all
the way down onto the body with flat friction washer
in middle and beveled washer on top.
b) Apply plumbers putty or sealant to bottom of flange.
c) Install drain body through drain opening in lava-
tory and screw flange onto the drain body making
sure that the threads are completely engaged for
proper sealing and strength of the connection.
Apply joint compound to all threaded parts to
insure proper seal. Apply putty or teflon tape to tail
piece before attaching to drain body.
d) Tighten locknut to compress the beveled flange
evenly across the bottom of the drain opening taking
care not to over tighten the locknut, causing damage
to the lavatory.
e) Remove one of two ball washers from inside the
threaded cavity. Insert pop-up plug and pivot rod
into body. Add one ball washer (the second ball
washer should remain inside the body) to the
outside of the ball. Tighten the retaining nut until
the ball is seated on the internal and external ball
washers. Note: The pop-up plug can be installed
either in the removable or non-removable position,
depending on the location of the hole located in the
guide at the bottom of the plug.
f) Slide the pivot rod through one side of the spring
clip, then the appropriate adjustment hole and then
other side of the spring clip.
g) Insert lift rod through faucet housing and the top of
the lift strap and secure it in place by tightening the
screw. Note: To insure proper operation of lift rod
and pop-up, some adjustment of the linkage may be
required. There are two possible adjustment points:
1) lift strap to lift rod and 2) lift strap to pivot rod.
4.
It is very important to thoroughly flush the supply
lines to prevent foreign matter, i.e. copper chips, sand,
stones, etc. from damaging the sealing surfaces of car-
tridge. Remove aerator and open hot and cold to full
open then open both supplies. Let water run through
hot and cold long enough to flush supply lines thor-
oughly. Shut off faucet and replace aerator. Check for
leaks.
Replacing handle
1.
Remove screw from top of handle. Remove red or blue
washer and then remove handle (LL-122) or (LL-123).
2
. Reassemble handle (LL-122) or (LL-123) in reverse
fashion.
Replacing cartridge
1.
Remove screw from top of handle. Remove red or blue
washer and then remove handle (LL-122) or (LL-123).
2.
Unthread cartridge cover (LL-127) from faucet.
3.
Place wrench on cartridge (LL-124) hex nut, turn
wrench counter clockwise until cartridge is removed.
4.
Install new cartridge (LL-124). Turn cartridge with
wrench until cartridge does not turn easily then turn
1/4 to 1/2 turn further.
5.
Reassemble cartridge cover (LL-127).
6.
Reassemble (LL-122) or (LL-123) handle in reverse
fashion.
Lavatory Faucet
S-250 Series
Installation and Service Instructions
Symmetrix
®
S-250-1-LWG
S-250-1