26
SILVER M
INSTALLATION
– OPERATING - MAINTENANCE
5.16.
Cleaning supplies
no.
group
aggregat component material
coating
cleaner constancy
disinfectant constancy
1
housing
housing
panels
galvanized
steel
"Anti-Finger-
Print"
metal cleaner article no.:
CP502
company: Kuhlmann
Incidur Spray / Incidin Rapid / Incidin Extra
N / Incidin perfekt
company: Ecolab
2
housing
cooler,
humidifier
, etc.
condensate
pan
stainless
steel
no
Edelstahl Protect (EP)
company: Solution
Glöckner
Vertriebs-GmbH
Incidur Spray / Incidin Rapid / Incidin Extra
N / Incidin perfekt
company: Ecolab
3
heat
exchanger
heater
fins
copper
no
Polygon PCG 1948
company: Polygon Chemie
AG
Incidur Spray / Incidin Rapid / Incidin Extra
N / Incidin perfekt
company: Ecolab
4
heat
exchanger
heater
pipes
copper
no
Polygon PCG 1948
company: Polygon Chemie
AG
Incidur Spray / Incidin Rapid / Incidin Extra
N / Incidin perfekt
company: Ecolab
5
heat
exchanger
cooler
fins
galvanized
steel
no
metal cleaner article no.:
CP502
company: Kuhlmann
Incidur Spray / Incidin Rapid / Incidin Extra
N / Incidin perfekt
company: Ecolab
6
heat
exchanger
cooler
pipes
galvanized
steel
no
metal cleaner article no.:
CP502
company: Kuhlmann
Incidur Spray / Incidin Rapid / Incidin Extra
N / Incidin perfekt
company: Ecolab
5.17.
Control Systems
General
After the commissioning, the first maintenance should be carried
out already after 6 months. Subsequently a maintenance interval of
a year is meaningful.
Prerequisites
All structural prerequisites, such as accessibility, finished air
handling unit and air duct assembly and uninterrupted availability of
all supply median must be fulfilled.
Commissioning
The commissioning may be carried out exclusively by trained
specialist personnel.
Activities
-
Examination of field devices on regular installation
-
Examination of voltage supply to switch board
-
Function test of parts contained in delivery
-
Configuration of controls and or DDC lower stations, and if
necessary loading the project specific control and SPS
software.
-
Commissioning and adjust the air conditioning
-
Adaptation of the parameters at the operating conditions of
the air conditioning
-
Testing of the control software
-
Introduction of the operator personnel
-
Examination of all safety functions
Maintenance
It is recommended to lock a maintenance contract with a trained
specialist company.
Maintenance works
See maintenance tables