ROWb

Installation – Commissioning – Maintenance

20140116

Installation 

•  Installation with the ROWT, see page 1, Figure 1.
•  Installation with the ALV, see page 2, Figure 2. 

Installation with the ROWT

1. The ROWT 1 commissioning box and the ROWT 2 

connecting duct should be built into the wall. Cut the 
opening in the wall structure for the ROW supply air 
wall terminal according to the dimensions specified in 
the dimension table and the dimension print. 

2. Insert the mounting plate into the ROWT 1 commis-

sioning box. 

3. Mark the positions for the bore holes. 

4. Bore the screw holes. 

5. Secure the mounting plate with screws to the wall. 

N.B.! The screwheads should have a height of max. 4 
mm above the plate surface. 

6. Secure the wall terminal face using steel blind rivets.

Figure 1. ROW + ROWT 1

Commissioning with the ALV

Commissioning should be carried out with the wall 
terminal face mounted. Pull the measurement hose and 
damper adjustment cords out of the wall terminal through 
the perforation. Connect a manometer to the measuring 
tube. The desired commissioning pressure can be calcu-
lated using the rated coefficient of performance (K-factor) 
of the wall terminal. Set the damper to the correct blade 
position, tie a commissioning knot in the damper cords to 
indicate the damper position. Then lock the cords against 
the locking screw in the air distribution baffle. See Figure 
2.
If the ROWT connecting duct accessory is used, we rec-
ommend installing a type CRM commissioning damper 
upstream of the wall terminal for adjusting the airflow 
rate.
The K-factor (COP) is specified on the product’s identifica-
tion label. K-factors are also specified in the relevant com-
missioning instructions available for download at www.
swegon.com. 

Maintenance

The wall terminal can be cleaned, if necessary, using 
lukewarm water with dishwashing detergent added or by 
vacuum cleaning using a brush nozzle. The duct system is 
accessed for cleaning by boring out the steel blind rivets 
and then withdrawing the wall terminal out of its spring 
retainers. If an ALV commissioning box is used, withdraw 
the acoustic baffle, move the distribution plate to the 
side, turn and withdraw the damper from its holder from 
the inlet. See Figure 2.