background image

COLIBRI

 Wall b

Installation – Commissioning – Maintenance

20210525

Accessories

Commissioning box:

ALV. Made of galvanized sheet steel. Contains removable 

commissioning damper, fixed measurement tapping and 

air distribution baffle. The commissioning box is available 

with two different connection options: rear and side con-

nection respectively.

Cover plate:

ALVT 1. For the aesthetic installation of the ALV commis-

sioning box.

Installation

Cut an opening in the wall according to the wall opening 
dimensions specified.
Place the commissioning box in the opening.
Insert the mounting frame into the commissioning box 
and secure it by means of screws in the short sides to the 
commissioning box and to the wall structure.
The assembly and dismantling of the component parts are 
shown in Figure 3.
Press the diffuser face to engage it in the mounting frame.
See Figure 3.

Figure 3. Installation, commissioning.

To secure baffle (4) in bayonet catch and to secure the octagonal perfo-
rated face plate (3) against the duct connection.
1. Commissioning box
2. Damper action, bayonet catch
3. Octagonal air distribution plate
4. Air distribution plate
5. Mounting frame + air diffuser

q

 = flow reading l/s

p

 = current pressure reading (Pa)

k

 = commissioning factor

k-factor

Figure 1. Standard nozzle pattern. (Short throw length)

Figure 2. Nozzle pattern, long throw length.

Nozzle settings

Commissioning

Commissioning must be carried out with the diffuser face 

in place. Pull the measuring hose and damper adjustment 

cords out of the air diffuser through a nozzle. Connect a 

manometer to the measurement hose. The desired com-

missioning pressure be computed by applying the rated 

coefficient of performance of the air diffuser. Set the 

damper to the correct blade position, tie a commissioning 

knot in the damper cords to indicate the damper position. 

Then lock the cords against the locking screw in the air 

distribution baffle.
The rated coefficient of performance (K-factor) is speci-

fied on the identification label of the product and in the 

relevant commissioning instructions at our website.

Maintenance

Clean the air diffuser when necessary using lukewarm 

water with added detergent. The duct system can be 

accessed after opening the diffuser face by pulling it down 

from the upper edge, withdrawing the air distribution 

baffle and lowering the fully open damper. See Figure 3.

k

p

q

=

k

p

q

=

(    )

2

5

q

COLIBRI Wall

Tomelilla

Sweden

400-200

+ALVT1 400-200-160-B

k = 14,6/27,8

k

p

0xD / ±5%

0xD / ±5%

2xD / ±10%

Figure 4. Installation alternatives, applies for all connections (B, K)

Reviews: